=== Summary Information === | === Summary Information === | ||
− | * Ownership: | + | * Ownership: HPCL LNG |
− | * Website: | + | * Website: https://www.hplng.in/ |
− | * Location: | + | * Location: Chhara, Gujarat, India |
* Capacity: 5.0 million tons/annum | * Capacity: 5.0 million tons/annum | ||
* Status: Under construction | * Status: Under construction | ||
=== Brief Description === | === Brief Description === | ||
− | + | * An onshore regasification terminal with two large tanks | |
+ | * The terminal is designed for potential expansion to 10 mtpa capacity | ||
+ | * The Project shall be operated on tolling business model wherein off-takers will book capacity in the terminal | ||
=== Technical Details === | === Technical Details === | ||
− | * Storage capacity: | + | * Storage capacity: 2 tanks of 200,000 m3 each |
* Unloading capacity: | * Unloading capacity: | ||
* Send out capacity: | * Send out capacity: | ||
* Constructor: | * Constructor: | ||
+ | ** Tractebel Engineering: Detailed feasibility study | ||
** Toyo-India: EPC work on a turnkey basis, from engineering to construction and commissioning | ** Toyo-India: EPC work on a turnkey basis, from engineering to construction and commissioning | ||
+ | ** IHI Corporation & Afcons: Engineering and procurement of the entire LNG tank, mechanical construction of the tank and trial operation | ||
=== Ongoing Projects/Project Status === | === Ongoing Projects/Project Status === | ||
− | + | * Under construction | |
+ | * Commissioning is scheduled for [[LNG Terminal Projects to be Completed in 2023 | 2023]] | ||
=== Suppliers / Customers === | === Suppliers / Customers === | ||
* Suppliers: | * Suppliers: | ||
− | * Customers: | + | * Customers: The customers will be gas traders who buy capacity and sell through the grid |
+ | |||
=== History === | === History === | ||
+ | * 2107 - Environmental clearance given for the project | ||
* 2019 - Toyo-India awarded EPC contract | * 2019 - Toyo-India awarded EPC contract | ||
+ | * 2021 - HPLC became 100% owner of the project | ||
=== Other Information === | === Other Information === | ||
Line 33: | Line 41: | ||
- | - | ||
=== Links === | === Links === | ||
+ | # [[Tractebel Engineering LNG References]] | ||
# [https://abarrelfull.blogspot.com/2022/01/toyo-awarded-lng-regasification-project.html TOYO Awarded LNG Regasification Project in India] | # [https://abarrelfull.blogspot.com/2022/01/toyo-awarded-lng-regasification-project.html TOYO Awarded LNG Regasification Project in India] | ||
# [https://abarrelfull.blogspot.com/2022/01/hpcl-acquires-balance-50-stake-in.html HPCL acquires balance 50% stake in Chhara LNG Terminal] | # [https://abarrelfull.blogspot.com/2022/01/hpcl-acquires-balance-50-stake-in.html HPCL acquires balance 50% stake in Chhara LNG Terminal] | ||
[[category:LNG]] | [[category:LNG]] | ||
− | [[category: | + | [[category:India]] |
Latest revision as of 11:00, 21 January 2022
Contents
Summary Information
- Ownership: HPCL LNG
- Website: https://www.hplng.in/
- Location: Chhara, Gujarat, India
- Capacity: 5.0 million tons/annum
- Status: Under construction
Brief Description
- An onshore regasification terminal with two large tanks
- The terminal is designed for potential expansion to 10 mtpa capacity
- The Project shall be operated on tolling business model wherein off-takers will book capacity in the terminal
Technical Details
- Storage capacity: 2 tanks of 200,000 m3 each
- Unloading capacity:
- Send out capacity:
- Constructor:
- Tractebel Engineering: Detailed feasibility study
- Toyo-India: EPC work on a turnkey basis, from engineering to construction and commissioning
- IHI Corporation & Afcons: Engineering and procurement of the entire LNG tank, mechanical construction of the tank and trial operation
Ongoing Projects/Project Status
- Under construction
- Commissioning is scheduled for 2023
Suppliers / Customers
- Suppliers:
- Customers: The customers will be gas traders who buy capacity and sell through the grid
History
- 2107 - Environmental clearance given for the project
- 2019 - Toyo-India awarded EPC contract
- 2021 - HPLC became 100% owner of the project
Other Information
-