Chennai LNG Terminal
Revision as of 16:37, 17 January 2022 by Abarrelfull (talk | contribs)
Summary Information
- Ownership: IndianOil
- Website: http://www.iocl.com/
- Location: Ennore, India
- Capacity: 5.0 million tons/annum
- Status: Under construction
+++ Brief Description
- A small regasification unit, the terminal will initially have the capacity to handle five million metric tonnes per annum (MMTPA), expanding to 15 MMTPA in the future
+++ Technical Details
- Storage capacity: 2 * 180,000m^^3^^ tanks
- Unloading capacity:
- Send out capacity:
- Constructor:
* **Tractebel:** Consultancy services for the preparation of a detailed feasibility report * **MHI:** Construction of LNG storage tanks
+++ Ongoing Projects/Project Status
- Under construction
- IOCL have awarded the contract for front-end engineering and design (FEED) study to Foster Wheeler
- Completion expected 2018
+++ Suppliers / Customers
- Suppliers:
- Customers: A 1000 MW LNG based Power plant on the same site will be the anchor customer
+++ History
- 2010 - IndianOil signs MoU with TIDCO
- 2012 - Foster Wheeler Awarded Contract for basic design, front-end engineering design, and the preparation of capital and operating cost estimates
- 2015 - MHI awarded tank construction contract
+++ Other Information
- -