* Location: Ennore, India | * Location: Ennore, India | ||
* Capacity: 5.0 million tons/annum | * Capacity: 5.0 million tons/annum | ||
− | * Status: | + | * Status: In operation |
− | + | === Brief Description === | |
* A small regasification unit, the terminal will initially have the capacity to handle five million metric tonnes per annum (MMTPA), expanding to 15 MMTPA in the future | * A small regasification unit, the terminal will initially have the capacity to handle five million metric tonnes per annum (MMTPA), expanding to 15 MMTPA in the future | ||
− | + | === Technical Details === | |
* Storage capacity: 2 * 180,000m^^3^^ tanks | * Storage capacity: 2 * 180,000m^^3^^ tanks | ||
* Unloading capacity: | * Unloading capacity: | ||
* Send out capacity: | * Send out capacity: | ||
* Constructor: | * Constructor: | ||
− | + | ** '''Tractebel:''' Consultancy services for the preparation of a detailed feasibility report | |
− | + | ** '''MHI:''' Construction of LNG storage tanks | |
+ | ** '''Foster Wheeler:''' front-end engineering and design (FEED) | ||
+ | === Ongoing Projects/Project Status === | ||
− | + | * The terminal was completed in [[LNG Terminal Projects Completed in 2019 | 2019]] | |
− | |||
− | |||
− | |||
− | + | === Suppliers / Customers === | |
* Suppliers: | * Suppliers: | ||
* Customers: A 1000 MW LNG based Power plant on the same site will be the anchor customer | * Customers: A 1000 MW LNG based Power plant on the same site will be the anchor customer | ||
− | + | === History === | |
* 2010 - IndianOil signs MoU with TIDCO | * 2010 - IndianOil signs MoU with TIDCO | ||
* 2012 - Foster Wheeler Awarded Contract for basic design, front-end engineering design, and the preparation of capital and operating cost estimates | * 2012 - Foster Wheeler Awarded Contract for basic design, front-end engineering design, and the preparation of capital and operating cost estimates | ||
* 2015 - MHI awarded tank construction contract | * 2015 - MHI awarded tank construction contract | ||
+ | * 2019 - Terminal operations started | ||
− | + | === Other Information === | |
* - | * - | ||
Revision as of 16:41, 17 January 2022
Contents
Summary Information
- Ownership: IndianOil
- Website: http://www.iocl.com/
- Location: Ennore, India
- Capacity: 5.0 million tons/annum
- Status: In operation
Brief Description
- A small regasification unit, the terminal will initially have the capacity to handle five million metric tonnes per annum (MMTPA), expanding to 15 MMTPA in the future
Technical Details
- Storage capacity: 2 * 180,000m^^3^^ tanks
- Unloading capacity:
- Send out capacity:
- Constructor:
- Tractebel: Consultancy services for the preparation of a detailed feasibility report
- MHI: Construction of LNG storage tanks
- Foster Wheeler: front-end engineering and design (FEED)
Ongoing Projects/Project Status
- The terminal was completed in 2019
Suppliers / Customers
- Suppliers:
- Customers: A 1000 MW LNG based Power plant on the same site will be the anchor customer
History
- 2010 - IndianOil signs MoU with TIDCO
- 2012 - Foster Wheeler Awarded Contract for basic design, front-end engineering design, and the preparation of capital and operating cost estimates
- 2015 - MHI awarded tank construction contract
- 2019 - Terminal operations started
Other Information
- -