Difference between revisions of "Cheleken Area Oil and Gas Fields"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 13: | Line 13: | ||
=== Contractors === | === Contractors === | ||
+ | * '''Ilk Insaat:''' EPIC of Wellhead Platform LAM-C | ||
* '''Petrofac-RNZ:''' | * '''Petrofac-RNZ:''' | ||
** Lam C Wellhead Platform | ** Lam C Wellhead Platform | ||
Line 29: | Line 30: | ||
=== Links === | === Links === | ||
# [[Aker Solutions Oil And Gas Processing References]] | # [[Aker Solutions Oil And Gas Processing References]] | ||
+ | # [[Ilk Insaat Platform References]] | ||
# [[Petrofac-RNZ Offshore and Platform References]] | # [[Petrofac-RNZ Offshore and Platform References]] | ||
# [[Process Group Oil And Gas Processing References]] | # [[Process Group Oil And Gas Processing References]] |
Latest revision as of 10:24, 22 February 2024
Summary Information
- Operator: Dragon Oil
- Country: Turkmenistan
- Location:
- Production start:
- Partners:
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
Description
- The Cheleken Contract Area covers approximately 950km² and comprises two offshore oil and gas fields, Dzheitune (Lam) and Dzhygalybeg (Zhdanov), in water depths of between eight and 42 metres.
Contractors
- Ilk Insaat: EPIC of Wellhead Platform LAM-C
- Petrofac-RNZ:
- Lam C Wellhead Platform
- Zhadanov B Drilling, Living Quarters Platform with Subsea Pipeline
- Aker Solutions:
- Two Slug Catchers, Fuel Gas Scrubber, Two Electrostatic Heater Treaters
- Process Group:
- Lam 13 & 28 Platforms - Flare KO & Vent/Drain Drum Skids
History
- 2000 - Dragon Oil awarded area licence
Geology
- The fields comprise two elongate anticlines situated at the eastern end of the prolific hydrocarbon Aspheron Ridge.