Difference between revisions of "Cheleken Area Oil and Gas Fields"

From A Barrel Full
Jump to navigation Jump to search
Line 18: Line 18:
 
* '''Aker Solutions:'''
 
* '''Aker Solutions:'''
 
** Two Slug Catchers, Fuel Gas Scrubber, Two Electrostatic Heater Treaters
 
** Two Slug Catchers, Fuel Gas Scrubber, Two Electrostatic Heater Treaters
 +
* '''Process Group:'''
 +
** Lam 13 & 28 Platforms - Flare KO & Vent/Drain Drum Skids
  
 
=== History ===
 
=== History ===
Line 28: Line 30:
 
# [[Aker Solutions Oil And Gas Processing References]]
 
# [[Aker Solutions Oil And Gas Processing References]]
 
# [[Petrofac-RNZ Offshore and Platform References]]
 
# [[Petrofac-RNZ Offshore and Platform References]]
 
+
# [[Process Group Oil And Gas Processing References]]
  
 
[[category:Field]]
 
[[category:Field]]
 
[[category:Turkmenistan]]
 
[[category:Turkmenistan]]
 
[[category:Dragon Oil]]
 
[[category:Dragon Oil]]

Revision as of 09:16, 22 February 2024

Summary Information

  • Operator: Dragon Oil
  • Country: Turkmenistan
  • Location:
  • Production start:
  • Partners:
  • Type: Oil / Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • The Cheleken Contract Area covers approximately 950km² and comprises two offshore oil and gas fields, Dzheitune (Lam) and Dzhygalybeg (Zhdanov), in water depths of between eight and 42 metres.

Contractors

  • Petrofac-RNZ:
    • Lam C Wellhead Platform
    • Zhadanov B Drilling, Living Quarters Platform with Subsea Pipeline
  • Aker Solutions:
    • Two Slug Catchers, Fuel Gas Scrubber, Two Electrostatic Heater Treaters
  • Process Group:
    • Lam 13 & 28 Platforms - Flare KO & Vent/Drain Drum Skids

History

  • 2000 - Dragon Oil awarded area licence

Geology

  • The fields comprise two elongate anticlines situated at the eastern end of the prolific hydrocarbon Aspheron Ridge.

Links

  1. Aker Solutions Oil And Gas Processing References
  2. Petrofac-RNZ Offshore and Platform References
  3. Process Group Oil And Gas Processing References