Difference between revisions of "Changxing Dalian Refinery Project"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "=== Summary Information === * Ownership: Hengli Petrochemical * Website: http://www.henglipc.com/ * Wiki Page: Changxing Dalian Refinery * Location: Changxing Dalian *...") |
Abarrelfull (talk | contribs) |
||
(One intermediate revision by the same user not shown) | |||
Line 12: | Line 12: | ||
=== The Project === | === The Project === | ||
− | * Project Type: A | + | * Project Type: A Greenfield refinery focused on petrochemicals |
* Project Summary: | * Project Summary: | ||
− | ** | + | ** A massive complex refinery designed to maximise petrochemicals output with a focus on paraxylene |
* Main Contractors: | * Main Contractors: | ||
** | ** | ||
* Licences: | * Licences: | ||
− | ** | + | ** Axen: Deasphalting unit, Ebullated bed residue hydrocracker, Hydrocracker, naphtha hydrotreating unit, (CCR) reforming unit, isomerization unit, Aromizing™ units |
=== Refining Units === | === Refining Units === | ||
− | * | + | * Deasphalting unit |
+ | * Ebullated bed residue hydrocracker | ||
+ | * Hydrocracker | ||
+ | * Naphtha hydrotreating unit | ||
+ | * Continuous catalytic regenerative (CCR) reforming unit | ||
+ | * Isomerization unit | ||
+ | * Aromizing™ units | ||
=== Terminal Capacity === | === Terminal Capacity === | ||
Line 34: | Line 40: | ||
* | * | ||
=== History === | === History === | ||
− | * | + | * 2016 - Axens awarded licences for multiple units |
+ | * 2019 - Refinery begins production | ||
=== Other Information === | === Other Information === | ||
Line 42: | Line 49: | ||
=== Links === | === Links === | ||
− | # [ ] | + | # [http://killajoules.wikidot.com/archive:axens-awarded-the-first-crude-to-paraxylene-complex Axens Awarded The First Crude-To-Paraxylene Complex In China] |
[[category:Refinery]] | [[category:Refinery]] |
Latest revision as of 14:42, 2 April 2020
Contents
Summary Information
- Ownership: Hengli Petrochemical
- Website: http://www.henglipc.com/
- Wiki Page: Changxing Dalian Refinery
- Location: Changxing Dalian
- Capacity: 20 million tons/annum & 400,000 bbl/day
- Nelson Complexity:
- Project Stage: Completed 2019
- Budget:
The Project
- Project Type: A Greenfield refinery focused on petrochemicals
- Project Summary:
- A massive complex refinery designed to maximise petrochemicals output with a focus on paraxylene
- Main Contractors:
- Licences:
- Axen: Deasphalting unit, Ebullated bed residue hydrocracker, Hydrocracker, naphtha hydrotreating unit, (CCR) reforming unit, isomerization unit, Aromizing™ units
Refining Units
- Deasphalting unit
- Ebullated bed residue hydrocracker
- Hydrocracker
- Naphtha hydrotreating unit
- Continuous catalytic regenerative (CCR) reforming unit
- Isomerization unit
- Aromizing™ units
Terminal Capacity
- Crude Oil:
- Refined Products:
Crude Supply
- -
Products Produced
History
- 2016 - Axens awarded licences for multiple units
- 2019 - Refinery begins production
Other Information
- -