* 1983 - Cassia Gas Field comes on stream
 
* 1983 - Cassia Gas Field comes on stream
 
* 2003 - Cassia B offshore gas processing facility is commissioned
 
* 2003 - Cassia B offshore gas processing facility is commissioned
 +
* 2018 - FID for the Cassia Compression project
 
* 2021 - Cassia C platform installed
 
* 2021 - Cassia C platform installed
 
* 2022 - Cassia C begins production  
 
* 2022 - Cassia C begins production  
Line 28: Line 29:
 
# [https://www.energy.gov.tt/historical-facts-petroleum/ Historical Facts on the Petroleum Industry of Trinidad and Tobago]
 
# [https://www.energy.gov.tt/historical-facts-petroleum/ Historical Facts on the Petroleum Industry of Trinidad and Tobago]
 
# [[TOFCO Platform References]]
 
# [[TOFCO Platform References]]
 +
# [https://abarrelfull.blogspot.com/2024/02/bp-announces-sanction-of-cassia.html BP announces sanction of Cassia Compression and Matapal gas projects in Trinidad]
 
# [https://abarrelfull.blogspot.com/2022/11/bp-announces-cassia-c-installation.html bp announces Cassia C installation]
 
# [https://abarrelfull.blogspot.com/2022/11/bp-announces-cassia-c-installation.html bp announces Cassia C installation]
 
# [https://abarrelfull.blogspot.com/2024/02/bp-starts-production-from-trinidad-and.html bp starts production from Trinidad and Tobago’s Cassia C facility]
 
# [https://abarrelfull.blogspot.com/2024/02/bp-starts-production-from-trinidad-and.html bp starts production from Trinidad and Tobago’s Cassia C facility]

Latest revision as of 08:24, 21 February 2024

Summary Information

  • Operator: BP
  • Country: Trinidad and Tobago
  • Location:
  • Production start: 1983
  • Partners:
  • Type: Gas and Condensate
  • Estimated Reserves:
  • Production Volume:

Description

  • The Cassia development consists of three platforms Cassia A, Cassia B, which is a processing platform and the compression platform, Cassia C.
  • Cassia C has a throughput capacity of 1.2 billion standard cubic feet of gas a day (bcfd)

Contractors

  • TOFCO - Construction of the jacket, or legs, and bridge landing frame of the Cassia C platform

History

  • 1983 - Cassia Gas Field comes on stream
  • 2003 - Cassia B offshore gas processing facility is commissioned
  • 2018 - FID for the Cassia Compression project
  • 2021 - Cassia C platform installed
  • 2022 - Cassia C begins production

Geology

Links

  1. Historical Facts on the Petroleum Industry of Trinidad and Tobago
  2. TOFCO Platform References
  3. BP announces sanction of Cassia Compression and Matapal gas projects in Trinidad
  4. bp announces Cassia C installation
  5. bp starts production from Trinidad and Tobago’s Cassia C facility