Difference between revisions of "Cassia Gas and Condensate Fields"

From A Barrel Full
Jump to navigation Jump to search
Line 3: Line 3:
 
* Country: Trinidad and Tobago  
 
* Country: Trinidad and Tobago  
 
* Location:  
 
* Location:  
* Production start:  
+
* Production start: 1983
 
* Partners:  
 
* Partners:  
* Type: Oil / Gas
+
* Type: Gas and Condensate
 
* Estimated Reserves:  
 
* Estimated Reserves:  
 
* Production Volume:  
 
* Production Volume:  
Line 11: Line 11:
 
=== Description ===
 
=== Description ===
 
* The Cassia development consists of three platforms Cassia A, Cassia B, which is a processing platform and the compression platform, Cassia C.  
 
* The Cassia development consists of three platforms Cassia A, Cassia B, which is a processing platform and the compression platform, Cassia C.  
 +
* Cassia C has a throughput capacity of 1.2 billion standard cubic feet of gas a day (bcfd)
  
 
=== Contractors ===
 
=== Contractors ===
* TOFCO - Construction of the jacket, or legs, and bridge landing frame of the Cassia C platform   
+
* '''TOFCO''' - Construction of the jacket, or legs, and bridge landing frame of the Cassia C platform   
  
 
=== History ===
 
=== History ===

Revision as of 08:00, 21 February 2024

Summary Information

  • Operator: BP
  • Country: Trinidad and Tobago
  • Location:
  • Production start: 1983
  • Partners:
  • Type: Gas and Condensate
  • Estimated Reserves:
  • Production Volume:

Description

  • The Cassia development consists of three platforms Cassia A, Cassia B, which is a processing platform and the compression platform, Cassia C.
  • Cassia C has a throughput capacity of 1.2 billion standard cubic feet of gas a day (bcfd)

Contractors

  • TOFCO - Construction of the jacket, or legs, and bridge landing frame of the Cassia C platform

History

  • 1983 - Cassia Gas Field comes on stream
  • 2003 - Cassia B offshore gas processing facility is commissioned
  • 2021 - Cassia C platform installed
  • 2022 - Cassia C begins production

Geology

Links

  1. Historical Facts on the Petroleum Industry of Trinidad and Tobago
  2. TOFCO Platform References
  3. bp announces Cassia C installation
  4. bp starts production from Trinidad and Tobago’s Cassia C facility