Difference between revisions of "Cassia Gas and Condensate Fields"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
(4 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
* Country: Trinidad and Tobago | * Country: Trinidad and Tobago | ||
* Location: | * Location: | ||
− | * Production start: | + | * Production start: 1983 |
* Partners: | * Partners: | ||
− | * Type: | + | * Type: Gas and Condensate |
* Estimated Reserves: | * Estimated Reserves: | ||
* Production Volume: | * Production Volume: | ||
=== Description === | === Description === | ||
− | * | + | * The Cassia development consists of three platforms Cassia A, Cassia B, which is a processing platform and the compression platform, Cassia C. |
+ | * Cassia C has a throughput capacity of 1.2 billion standard cubic feet of gas a day (bcfd) | ||
=== Contractors === | === Contractors === | ||
− | * - | + | * '''TOFCO''' - Construction of the jacket, or legs, and bridge landing frame of the Cassia C platform |
=== History === | === History === | ||
* 1983 - Cassia Gas Field comes on stream | * 1983 - Cassia Gas Field comes on stream | ||
* 2003 - Cassia B offshore gas processing facility is commissioned | * 2003 - Cassia B offshore gas processing facility is commissioned | ||
+ | * 2018 - FID for the Cassia Compression project | ||
+ | * 2021 - Cassia C platform installed | ||
+ | * 2022 - Cassia C begins production | ||
=== Geology === | === Geology === | ||
Line 24: | Line 28: | ||
=== Links === | === Links === | ||
# [https://www.energy.gov.tt/historical-facts-petroleum/ Historical Facts on the Petroleum Industry of Trinidad and Tobago] | # [https://www.energy.gov.tt/historical-facts-petroleum/ Historical Facts on the Petroleum Industry of Trinidad and Tobago] | ||
+ | # [[TOFCO Platform References]] | ||
+ | # [https://abarrelfull.blogspot.com/2024/02/bp-announces-sanction-of-cassia.html BP announces sanction of Cassia Compression and Matapal gas projects in Trinidad] | ||
+ | # [https://abarrelfull.blogspot.com/2022/11/bp-announces-cassia-c-installation.html bp announces Cassia C installation] | ||
+ | # [https://abarrelfull.blogspot.com/2024/02/bp-starts-production-from-trinidad-and.html bp starts production from Trinidad and Tobago’s Cassia C facility] | ||
[[category:Field]] | [[category:Field]] | ||
[[category:Trinidad and Tobago]] | [[category:Trinidad and Tobago]] | ||
[[category:BP]] | [[category:BP]] |
Latest revision as of 08:24, 21 February 2024
Summary Information
- Operator: BP
- Country: Trinidad and Tobago
- Location:
- Production start: 1983
- Partners:
- Type: Gas and Condensate
- Estimated Reserves:
- Production Volume:
Description
- The Cassia development consists of three platforms Cassia A, Cassia B, which is a processing platform and the compression platform, Cassia C.
- Cassia C has a throughput capacity of 1.2 billion standard cubic feet of gas a day (bcfd)
Contractors
- TOFCO - Construction of the jacket, or legs, and bridge landing frame of the Cassia C platform
History
- 1983 - Cassia Gas Field comes on stream
- 2003 - Cassia B offshore gas processing facility is commissioned
- 2018 - FID for the Cassia Compression project
- 2021 - Cassia C platform installed
- 2022 - Cassia C begins production