Difference between revisions of "Cassia Gas and Condensate Fields"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 13: | Line 13: | ||
=== Contractors === | === Contractors === | ||
− | * - | + | * TOFCO - Construction of the jacket, or legs, and bridge landing frame of the Cassia C platform |
=== History === | === History === | ||
* 1983 - Cassia Gas Field comes on stream | * 1983 - Cassia Gas Field comes on stream | ||
* 2003 - Cassia B offshore gas processing facility is commissioned | * 2003 - Cassia B offshore gas processing facility is commissioned | ||
+ | * 2021 - Cassia C platform installed | ||
=== Geology === | === Geology === | ||
Line 24: | Line 25: | ||
=== Links === | === Links === | ||
# [https://www.energy.gov.tt/historical-facts-petroleum/ Historical Facts on the Petroleum Industry of Trinidad and Tobago] | # [https://www.energy.gov.tt/historical-facts-petroleum/ Historical Facts on the Petroleum Industry of Trinidad and Tobago] | ||
+ | # [https://abarrelfull.blogspot.com/2022/11/bp-announces-cassia-c-installation.html bp announces Cassia C installation] | ||
[[category:Field]] | [[category:Field]] | ||
[[category:Trinidad and Tobago]] | [[category:Trinidad and Tobago]] | ||
[[category:BP]] | [[category:BP]] |
Revision as of 10:37, 20 November 2022
Summary Information
- Operator: BP
- Country: Trinidad and Tobago
- Location:
- Production start:
- Partners:
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
Description
Contractors
- TOFCO - Construction of the jacket, or legs, and bridge landing frame of the Cassia C platform
History
- 1983 - Cassia Gas Field comes on stream
- 2003 - Cassia B offshore gas processing facility is commissioned
- 2021 - Cassia C platform installed