Cassia Gas and Condensate Fields

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Operator: BP
  • Country: Trinidad and Tobago
  • Location:
  • Production start: 1983
  • Partners:
  • Type: Gas and Condensate
  • Estimated Reserves:
  • Production Volume:

Description

  • The Cassia development consists of three platforms Cassia A, Cassia B, which is a processing platform and the compression platform, Cassia C.
  • Cassia C has a throughput capacity of 1.2 billion standard cubic feet of gas a day (bcfd)

Contractors

  • TOFCO - Construction of the jacket, or legs, and bridge landing frame of the Cassia C platform

History

  • 1983 - Cassia Gas Field comes on stream
  • 2003 - Cassia B offshore gas processing facility is commissioned
  • 2018 - FID for the Cassia Compression project
  • 2021 - Cassia C platform installed
  • 2022 - Cassia C begins production

Geology

Links

  1. Historical Facts on the Petroleum Industry of Trinidad and Tobago
  2. TOFCO Platform References
  3. BP announces sanction of Cassia Compression and Matapal gas projects in Trinidad
  4. bp announces Cassia C installation
  5. bp starts production from Trinidad and Tobago’s Cassia C facility