Cashima Gas Field
Jump to navigation
Jump to search
Summary Information
- Operator: BP
- Country: Trinidad And Tobago
- Location:
- Production start:
- Partners:
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
+++ Description
- The field has been efficiently developed using a single unmanned platform
- Cashima has a capacity to produce from nine wells with gas exported through a new 11-mile 26-inch pipeline to the Amherstia gas processing hub
- Gas is supplied to the Atlantic LNG Terminal
+++ Contractors
- **Tofco:** Deck, Jacket and Subsea Spool Fabrication: 2000 Tons
- **FoundOcean:** Grouting
+++ History
- 2001 - Cashima Gas Field discovered
- 2007 - Production started
+++ Geology
+++ Links