Carapeba, Garoupa, Pargo and Vermelho Oil and Gas Fields

From A Barrel Full
Revision as of 07:13, 12 May 2023 by Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: * Country: Brazil * Location: Campos Basin * Production start: * Partners: * Type: Oil / Gas * Estimated Reserves: * Production Volume:...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Summary Information

  • Operator:
  • Country: Brazil
  • Location: Campos Basin
  • Production start:
  • Partners:
  • Type: Oil / Gas
  • Estimated Reserves:
  • Production Volume:

+++ Description

  • Carapeba, Garoupa, Pargo And Vermelho fields are operated together
    • Carapeba has two fixed platforms, PCP-1 & PCP-2
    • Garoupa has one fixed platform, PCP-1
    • Pargo utilises on fixed platform, PPG-1
    • The Vermelho field has 3 fixed platforms, PVM-1, PVM-2 & PVM-3

+++ Contractors

  • Saipem: Garoupa - Albacora Pipeline, T & I

+++ History

  • 1974 - Garoupa field discovered
  • 1982 - Carapeba field discovered

+++ Geology

  • Carapeba field primarily produces from two upper Cretaceous turbidite sandstones, with additional production from Eocene sands.

+++ Links

  1. Integrated Asset Management, Schlumberger
  2. Saipem Pipeline References