− | Summary Information | + | === Summary Information === |
* Operator: CNOOC | * Operator: CNOOC | ||
* Location: Bohai Bay | * Location: Bohai Bay | ||
Line 8: | Line 8: | ||
* Production Volume: | * Production Volume: | ||
− | + | === Description === | |
* The first phase of the development includes one 48-slot wellhead gathering platform and one 24-slot wellhead platform. | * The first phase of the development includes one 48-slot wellhead gathering platform and one 24-slot wellhead platform. | ||
* Phase 2 consists of a core-area gathering platform and two smaller unmanned satellite platforms, which are tied back approximately 13 kilometers to the FPSO | * Phase 2 consists of a core-area gathering platform and two smaller unmanned satellite platforms, which are tied back approximately 13 kilometers to the FPSO | ||
Line 16: | Line 16: | ||
* The Caofeidian (CFD) 11-6/12-1S field has three wellhead platforms and is tied back via a 13-kilometer sub-sea pipeline to the FPSO | * The Caofeidian (CFD) 11-6/12-1S field has three wellhead platforms and is tied back via a 13-kilometer sub-sea pipeline to the FPSO | ||
− | + | === Contractors === | |
* **CNOOC Engineering:** Engineering, development and construction for both phases | * **CNOOC Engineering:** Engineering, development and construction for both phases | ||
* **APL:** Provided complete SAL Yoke Systems (SYS) | * **APL:** Provided complete SAL Yoke Systems (SYS) | ||
* **JDR Cable Systems:** Supply of dynamic catenary umbilicals | * **JDR Cable Systems:** Supply of dynamic catenary umbilicals | ||
− | + | === History === | |
* 2004 - First oil produced from CFD 11-1/11-2 | * 2004 - First oil produced from CFD 11-1/11-2 | ||
* 2006 - Production started from Phase 2 | * 2006 - Production started from Phase 2 | ||
* 2014 - Anadarko sells its stake to Brightoil | * 2014 - Anadarko sells its stake to Brightoil | ||
+ | * 2021 - The field was connected to an onshore power plant | ||
− | + | === Geology === | |
* | * | ||
− | + | === Links === | |
# [http://killajoules.wikidot.com/archive:oil-fields-cfd-11-1-11-2-came-on-stream Oil Fields CFD 11-1/11-2 Came On Stream] | # [http://killajoules.wikidot.com/archive:oil-fields-cfd-11-1-11-2-came-on-stream Oil Fields CFD 11-1/11-2 Came On Stream] | ||
# [http://killajoules.wikidot.com/archive:cable-and-umbilical-specialist-jdr-supplies-electro Cable And Umbilical Specialist, JDR, Supplies Electro-Optical Power And Communication Cables To Bohai Bay Project] | # [http://killajoules.wikidot.com/archive:cable-and-umbilical-specialist-jdr-supplies-electro Cable And Umbilical Specialist, JDR, Supplies Electro-Optical Power And Communication Cables To Bohai Bay Project] | ||
Line 35: | Line 36: | ||
# [http://killajoules.wikidot.com/archive:cnooc-engineering-celebrate-the-successful-startup-o CNOOC Engineering celebrate the successful startup of the CFD phase II oil field] | # [http://killajoules.wikidot.com/archive:cnooc-engineering-celebrate-the-successful-startup-o CNOOC Engineering celebrate the successful startup of the CFD phase II oil field] | ||
# [http://killajoules.wikidot.com/archive:anadarko-announces-1-075-billion-china-divestiture Anadarko Announces $1.075 Billion China Divestiture] | # [http://killajoules.wikidot.com/archive:anadarko-announces-1-075-billion-china-divestiture Anadarko Announces $1.075 Billion China Divestiture] | ||
+ | # [https://abarrelfull.blogspot.com/2023/11/cnooc-limited-announces-qinhuangdao.html CNOOC Limited Announces Qinhuangdao/ Caofeidian Onshore Power Project Commences Operation Successfully] | ||
+ | |||
+ | [[category:Field]] | ||
+ | [[category:China]] | ||
+ | [[category:CNOOC]] |
Latest revision as of 12:37, 16 November 2023
Summary Information
- Operator: CNOOC
- Location: Bohai Bay
- Production start: 2004
- Partners: CNOOC, Chevron, Brightoil
- Type: Oil
- Estimated Reserves:
- Production Volume:
Description
- The first phase of the development includes one 48-slot wellhead gathering platform and one 24-slot wellhead platform.
- Phase 2 consists of a core-area gathering platform and two smaller unmanned satellite platforms, which are tied back approximately 13 kilometers to the FPSO
- The field utilises the Hai Yang Shi You 112 FPSO, a floating production, storage and offloading facility (FPSO), as the main production platform.
- The FPSO can process up to 80,000 barrels of oil and 350,000 barrels of gross liquids a day. It can store up to one million barrels of oil for offloading to shuttle tankers.
- The Caofeidian (CFD) 11-3/5 field was developed as a satellite
- The Caofeidian (CFD) 11-6/12-1S field has three wellhead platforms and is tied back via a 13-kilometer sub-sea pipeline to the FPSO
Contractors
- **CNOOC Engineering:** Engineering, development and construction for both phases
- **APL:** Provided complete SAL Yoke Systems (SYS)
- **JDR Cable Systems:** Supply of dynamic catenary umbilicals
History
- 2004 - First oil produced from CFD 11-1/11-2
- 2006 - Production started from Phase 2
- 2014 - Anadarko sells its stake to Brightoil
- 2021 - The field was connected to an onshore power plant
Geology
Links
- Oil Fields CFD 11-1/11-2 Came On Stream
- Cable And Umbilical Specialist, JDR, Supplies Electro-Optical Power And Communication Cables To Bohai Bay Project
- Anadarko Starts Production from New Satellite Facilities in Bohai Bay, China
- CNOOC Engineering celebrate the successful startup of the CFD phase II oil field
- Anadarko Announces $1.075 Billion China Divestiture
- CNOOC Limited Announces Qinhuangdao/ Caofeidian Onshore Power Project Commences Operation Successfully