Difference between revisions of "Cameroon Hilli FLNG Terminal"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 5: | Line 5: | ||
* Location: | * Location: | ||
* Capacity: million tons/annum | * Capacity: million tons/annum | ||
− | * Status: | + | * Status: In Operation |
=== Brief Description === | === Brief Description === |
Revision as of 14:21, 1 December 2023
Contents
Summary Information
- Ownership:
- Website:
- Location:
- Capacity: million tons/annum
- Status: In Operation
Brief Description
- The terminal utilises the vessel, Hilli Episeyo, which was built in 1975 and converted in 2017
- Anchored 2 km from the Sanaga 1 platform off Kribi since 20 November 2017, it has been equipped with four liquefaction trains, each to produce between 500,000 to 700,000 tons per year of LNG with an on-board storage of 125,000 m3.
- LNG carriers with a capacity of 70,000 to 175,000 m3 can be stowed and the loading is carried out by three transfer arms at a flow rate of 10,000 m3/hour
Technical Details
- Storage capacity:
- Constructor:
- Licensor:
Ongoing Projects/Project Status
- The terminal was commissioned in 2018
Suppliers / Customers
- Suppliers: The gas is supplied from the Sanaga Gas and Condensate Field
- Customers:
History
- 2017 - Vessel conversion was completed
- 2018 - Commercial operations began
Other Information
- -