Difference between revisions of "Cameroon Hilli FLNG Terminal"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "=== Summary Information === * Ownership: * Website: * Location: * Capacity: million tons/annum * Status: (In Operation / Planned / Under Construction) === Brief Descrip...")
 
Line 8: Line 8:
  
 
=== Brief Description ===
 
=== Brief Description ===
* -
+
* The terminal utilises the vessel, Hilli Episeyo, which was built in 1975 and converted in 2017
  
 
=== Technical Details ===
 
=== Technical Details ===

Revision as of 08:08, 27 June 2022

Summary Information

  • Ownership:
  • Website:
  • Location:
  • Capacity: million tons/annum
  • Status: (In Operation / Planned / Under Construction)

Brief Description

  • The terminal utilises the vessel, Hilli Episeyo, which was built in 1975 and converted in 2017

Technical Details

  • Storage capacity:
  • Constructor:
  • Licensor:

Ongoing Projects/Project Status

  • Commissioning is expected in 202X

Suppliers / Customers

  • Suppliers:
  • Customers:

History

  • -

Other Information

  • -

Links

  1. -