Summary Information
+
=== Summary Information ===
  
Ownership: Sempra
+
* Ownership: Sempra
Website: http://www.sempralng.com/
+
* Website: https://cameronlng.com/
Location: On the Calcasieu Channel, 18 miles from the Gulf of Mexico in Hackberry, Louisiana
+
* Cameron LNG’s partners are Sempra Infrastructure, Mitsui & Co., Mitsubishi Corporation, TotalEnergies, and NYK Line
Capacity: 12.0 million tons/annum
+
* Location: On the Calcasieu Channel, 18 miles from the Gulf of Mexico in Hackberry, Louisiana
Status: Planned
+
* Capacity: 12.0 million tons/annum
Brief Description
+
* Status: In operation
  
A conversion of the existing Cameron LNG Terminal into a large liquifaction terminal
+
=== Brief Description ===
Cameron plans to construct three separate systems that liquefy natural gas; one 160,000-cubic-meter, full-containment LNG storage tank; refrigerant make-up and condensate product storage; a truck loading/unloading area; one marine work dock; minor modifications to existing terminal facilities; 21 miles of 42-inch-diameter pipeline; one 56,820-horsepower compressor station; and ancillary facilities.
 
Technical Details
 
  
Storage capacity: Four full-containment storage tanks (4 x 160,000 cubic meters) (One additional tank)
+
* A conversion of the existing [[Cameron LNG Terminal]] into a large liquifaction terminal
Constructor:
+
* The project added three separate systems that liquefy natural gas; one 160,000-cubic-meter, full-containment LNG storage tank; refrigerant make-up and condensate product storage; a truck loading/unloading area; one marine work dock; minor modifications to existing terminal facilities; 21 miles of 42-inch-diameter pipeline; one 56,820-horsepower compressor station; and ancillary facilities.
Foster Wheeler: Owner's Engineer Contract
 
Tractebel: review of FEED LNG liquefaction/process package
 
CB&I and Chiyoda: Engineering, procurement and construction for the addition of natural gas liquefaction and export facilities
 
Licence: Air Products
 
Ongoing Projects/Project Status
 
  
Commissioning is expected in 2018
+
=== Technical Details ===
Suppliers / Customers
 
  
Suppliers:
+
* Storage capacity: Four full-containment storage tanks (4 x 160,000 cubic meters) (One additional tank)
Customers:
+
* Constructor:
GDF SUEZ will buy 4 million tons per annum (MTPA)
+
** Foster Wheeler: Owner's Engineer Contract
TEPCO will buy 800,000 tons per annum (MTPA)
+
** Tractebel: review of FEED LNG liquefaction/process package
Toho Gas will buy 300,000 tons per annum
+
** CB&I and Chiyoda: Engineering, procurement and construction for the addition of natural gas liquefaction and export facilities
CPC of Taiwan will buy 0.8 million tons per annum
+
* Licence: Air Products
History
+
 +
=== Ongoing Projects/Project Status ===
  
2012 - Foster Wheeler Wins Owner's Engineer Contract
+
* The terminal was commissioned in [[LNG Terminal Projects Completed in 2019 | 2019]]
2012 - GDF-Suez signs purchase agreement
+
* In 2016, Cameron LNG received all the regulatory approvals needed to expand the base 3-Train project. The Expansion Project, if undertaken, would include two additional liquefaction Trains (Trains No. 4 and No. 5) and up to two additional full containment LNG storage tanks.
2013 - Tepco signs a purchase contract
+
 
2013 - Sempra Energy, GDF SUEZ, Mitsubishi, Mitsui Sign Tolling Capacity, Joint-Venture Agreement
+
=== Suppliers / Customers ===
2014 - Draft environmental impact statement released
+
 
2014 - Export permits granted
+
* Suppliers: The Cameron Interstate Pipeline connects the terminal to [[Trunkline Gas Company Pipeline]], [[Transcontinental Gas Pipe Line (Transco)]], [[Texas Eastern Transmission Gas Pipeline]] and the [[Tennessee Gas Pipeline]]
2014 - EPC contract awarded
+
* Customers:
2014 - FERC issues Final Environmental Impact Statement
+
** GDF SUEZ will buy 4 million tons per annum (MTPA)
2014 - FID made
+
** TEPCO will buy 800,000 tons per annum (MTPA)
2014 - Construction started
+
** Toho Gas will buy 300,000 tons per annum
 +
** CPC of Taiwan will buy 0.8 million tons per annum
 +
 
 +
=== History ===
 +
 
 +
* 2012 - Foster Wheeler Wins Owner's Engineer Contract
 +
* 2012 - GDF-Suez signs purchase agreement
 +
* 2013 - Tepco signs a purchase contract
 +
* 2013 - Sempra Energy, GDF SUEZ, Mitsubishi, Mitsui Sign Tolling Capacity, Joint-Venture Agreement
 +
* 2014 - Draft environmental impact statement released
 +
* 2014 - Export permits granted
 +
* 2014 - EPC contract awarded
 +
* 2014 - FERC issues Final Environmental Impact Statement
 +
* 2014 - FID made
 +
* 2014 - Construction started
 +
* 2018 - Total becomes a shareholder
 +
* 2019 - Train 1 begins operations
 
* 2020 - Train 3 begins operations
 
* 2020 - Train 3 begins operations
Other Information
+
 
 +
=== Other Information ===
  
 
-
 
-
 +
 
=== Links ===
 
=== Links ===
  
ctebel Engineering LNG References]]]
+
# [[Long Term Applications Received by DOE/FE]]
 +
# [[LNG Terminals Using Air Products Technology]]
 +
# [[Chiyoda Acid Gas Removal References]]
 +
# [[Tractebel Engineering LNG References]]
 
# [http://killajoules.wikidot.com/blog:2443 Foster Wheeler Wins Owner's Engineer Contract for LNG Liquefaction Facility in Louisiana]
 
# [http://killajoules.wikidot.com/blog:2443 Foster Wheeler Wins Owner's Engineer Contract for LNG Liquefaction Facility in Louisiana]
 
# [http://killajoules.wikidot.com/blog:2475 GDF SUEZ signs an agreement with Sempra Energyto access natural gas liquefaction capacity in the United States]
 
# [http://killajoules.wikidot.com/blog:2475 GDF SUEZ signs an agreement with Sempra Energyto access natural gas liquefaction capacity in the United States]
Line 63: Line 77:
 
# [http://killajoules.wikidot.com/blog:5524 Cameron LNG Liquefaction Project Breaks Ground In Louisiana]
 
# [http://killajoules.wikidot.com/blog:5524 Cameron LNG Liquefaction Project Breaks Ground In Louisiana]
 
# [http://killajoules.wikidot.com/blog:5721 Air Products Wins LNG Technology and Equipment Order for Louisiana Terminal Facility]
 
# [http://killajoules.wikidot.com/blog:5721 Air Products Wins LNG Technology and Equipment Order for Louisiana Terminal Facility]
Tractebel Engineering LNG References
+
# [https://abarrelfull.blogspot.com/2022/01/total-closes-acquisition-of-engies.html Total Closes the acquisition of Engie’s Upstream LNG Business And Becomes World #2 LNG Player]
Foster Wheeler Wins Owner's Engineer Contract for LNG Liquefaction Facility in Louisiana
+
# [https://abarrelfull.blogspot.com/2022/01/cameron-lngs-train-1-begins-commercial.html Cameron LNG’s Train 1 Begins Commercial Operations]
GDF SUEZ signs an agreement with Sempra Energyto access natural gas liquefaction capacity in the United States
 
Purchase of Lean LNG from the U.S. Cameron Project Basic Agreement on the First Project to Secure 10 Million Lean LNG Annually
 
Sempra Energy, GDF SUEZ, Mitsubishi, Mitsui Sign Tolling Capacity, Joint-Venture Agreements For Louisiana Liquefaction Export Facility
 
GDF SUEZ to become a U.S. LNG exporter, with the Cameron LNG project
 
DEIS on Cameron LNG, LLC’s and Cameron Interstate Pipeline, LLC’s Liquefaction Project
 
Toho Gas in agreement with the U.S. Cameron Project for LNG purchase
 
Sempra Energy Subsidiary Receives U.S. Department of Energy LNG Export License For Louisiana Liquefaction Facility
 
CB&I and Chiyoda Awarded Contract for LNG Liquefaction and Export Facilities
 
First GDF SUEZ long term LNG sale to Asia with a 0.8 mtpa contract to CPC of Taiwan
 
FERC issues Final Environmental Impact Statement on Cameron LNG
 
First GDF SUEZ long term LNG sales to Japan
 
GDF SUEZ and its partners take Final Investment Decision for the Cameron LNG project
 
Cameron LNG Liquefaction Project Breaks Ground In Louisiana
 
Air Products Wins LNG Technology and Equipment Order for Louisiana Terminal Facility
 
 
# [https://lng-news.blogspot.com/2020/08/cameron-lng-train-3-begins-commercial.html Cameron LNG Train 3 Begins Commercial Operation]
 
# [https://lng-news.blogspot.com/2020/08/cameron-lng-train-3-begins-commercial.html Cameron LNG Train 3 Begins Commercial Operation]
 +
 +
[[category:LNG]]
 +
[[category:USA]]
 +
[[category:Sempra]]

Latest revision as of 06:55, 14 February 2024

Summary Information

  • Ownership: Sempra
  • Website: https://cameronlng.com/
  • Cameron LNG’s partners are Sempra Infrastructure, Mitsui & Co., Mitsubishi Corporation, TotalEnergies, and NYK Line
  • Location: On the Calcasieu Channel, 18 miles from the Gulf of Mexico in Hackberry, Louisiana
  • Capacity: 12.0 million tons/annum
  • Status: In operation

Brief Description

  • A conversion of the existing Cameron LNG Terminal into a large liquifaction terminal
  • The project added three separate systems that liquefy natural gas; one 160,000-cubic-meter, full-containment LNG storage tank; refrigerant make-up and condensate product storage; a truck loading/unloading area; one marine work dock; minor modifications to existing terminal facilities; 21 miles of 42-inch-diameter pipeline; one 56,820-horsepower compressor station; and ancillary facilities.

Technical Details

  • Storage capacity: Four full-containment storage tanks (4 x 160,000 cubic meters) (One additional tank)
  • Constructor:
    • Foster Wheeler: Owner's Engineer Contract
    • Tractebel: review of FEED LNG liquefaction/process package
    • CB&I and Chiyoda: Engineering, procurement and construction for the addition of natural gas liquefaction and export facilities
  • Licence: Air Products

Ongoing Projects/Project Status

  • The terminal was commissioned in 2019
  • In 2016, Cameron LNG received all the regulatory approvals needed to expand the base 3-Train project. The Expansion Project, if undertaken, would include two additional liquefaction Trains (Trains No. 4 and No. 5) and up to two additional full containment LNG storage tanks.

Suppliers / Customers

History

  • 2012 - Foster Wheeler Wins Owner's Engineer Contract
  • 2012 - GDF-Suez signs purchase agreement
  • 2013 - Tepco signs a purchase contract
  • 2013 - Sempra Energy, GDF SUEZ, Mitsubishi, Mitsui Sign Tolling Capacity, Joint-Venture Agreement
  • 2014 - Draft environmental impact statement released
  • 2014 - Export permits granted
  • 2014 - EPC contract awarded
  • 2014 - FERC issues Final Environmental Impact Statement
  • 2014 - FID made
  • 2014 - Construction started
  • 2018 - Total becomes a shareholder
  • 2019 - Train 1 begins operations
  • 2020 - Train 3 begins operations

Other Information

-

Links

  1. Long Term Applications Received by DOE/FE
  2. LNG Terminals Using Air Products Technology
  3. Chiyoda Acid Gas Removal References
  4. Tractebel Engineering LNG References
  5. Foster Wheeler Wins Owner's Engineer Contract for LNG Liquefaction Facility in Louisiana
  6. GDF SUEZ signs an agreement with Sempra Energyto access natural gas liquefaction capacity in the United States
  7. Purchase of Lean LNG from the U.S. Cameron Project Basic Agreement on the First Project to Secure 10 Million Lean LNG Annually
  8. Sempra Energy, GDF SUEZ, Mitsubishi, Mitsui Sign Tolling Capacity, Joint-Venture Agreements For Louisiana Liquefaction Export Facility
  9. GDF SUEZ to become a U.S. LNG exporter, with the Cameron LNG project
  10. DEIS on Cameron LNG, LLC’s and Cameron Interstate Pipeline, LLC’s Liquefaction Project
  11. Toho Gas in agreement with the U.S. Cameron Project for LNG purchase
  12. Sempra Energy Subsidiary Receives U.S. Department of Energy LNG Export License For Louisiana Liquefaction Facility
  13. CB&I and Chiyoda Awarded Contract for LNG Liquefaction and Export Facilities
  14. First GDF SUEZ long term LNG sale to Asia with a 0.8 mtpa contract to CPC of Taiwan
  15. FERC issues Final Environmental Impact Statement on Cameron LNG
  16. First GDF SUEZ long term LNG sales to Japan
  17. GDF SUEZ and its partners take Final Investment Decision for the Cameron LNG project
  18. Cameron LNG Liquefaction Project Breaks Ground In Louisiana
  19. Air Products Wins LNG Technology and Equipment Order for Louisiana Terminal Facility
  20. Total Closes the acquisition of Engie’s Upstream LNG Business And Becomes World #2 LNG Player
  21. Cameron LNG’s Train 1 Begins Commercial Operations
  22. Cameron LNG Train 3 Begins Commercial Operation