Difference between revisions of "Cameron LNG Export Terminal Project"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information Ownership: Sempra Website: http://www.sempralng.com/ Location: On the Calcasieu Channel, 18 miles from the Gulf of Mexico in Hackberry, Louisiana Capacity...") |
Abarrelfull (talk | contribs) |
||
(23 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | Summary Information | + | === Summary Information === |
− | Ownership: Sempra | + | * Ownership: Sempra |
− | Website: | + | * Website: https://cameronlng.com/ |
− | Location: On the Calcasieu Channel, 18 miles from the Gulf of Mexico in Hackberry, Louisiana | + | * Cameron LNG’s partners are Sempra Infrastructure, Mitsui & Co., Mitsubishi Corporation, TotalEnergies, and NYK Line |
− | Capacity: 12.0 million tons/annum | + | * Location: On the Calcasieu Channel, 18 miles from the Gulf of Mexico in Hackberry, Louisiana |
− | Status: | + | * Capacity: 12.0 million tons/annum |
− | + | * Status: In operation | |
− | + | === Brief Description === | |
− | |||
− | |||
− | + | * A conversion of the existing [[Cameron LNG Terminal]] into a large liquifaction terminal | |
− | + | * The project added three separate systems that liquefy natural gas; one 160,000-cubic-meter, full-containment LNG storage tank; refrigerant make-up and condensate product storage; a truck loading/unloading area; one marine work dock; minor modifications to existing terminal facilities; 21 miles of 42-inch-diameter pipeline; one 56,820-horsepower compressor station; and ancillary facilities. | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | + | === Technical Details === | |
− | |||
− | + | * Storage capacity: Four full-containment storage tanks (4 x 160,000 cubic meters) (One additional tank) | |
− | + | * Constructor: | |
− | + | ** Foster Wheeler: Owner's Engineer Contract | |
− | + | ** Tractebel: review of FEED LNG liquefaction/process package | |
− | + | ** CB&I and Chiyoda: Engineering, procurement and construction for the addition of natural gas liquefaction and export facilities | |
− | + | * Licence: Air Products | |
− | + | ||
+ | === Ongoing Projects/Project Status === | ||
− | 2012 - Foster Wheeler Wins Owner's Engineer Contract | + | * The terminal was commissioned in [[LNG Terminal Projects Completed in 2019 | 2019]] |
− | 2012 - GDF-Suez signs purchase agreement | + | * In 2016, Cameron LNG received all the regulatory approvals needed to expand the base 3-Train project. The Expansion Project, if undertaken, would include two additional liquefaction Trains (Trains No. 4 and No. 5) and up to two additional full containment LNG storage tanks. |
− | 2013 - Tepco signs a purchase contract | + | |
− | 2013 - Sempra Energy, GDF SUEZ, Mitsubishi, Mitsui Sign Tolling Capacity, Joint-Venture Agreement | + | === Suppliers / Customers === |
− | 2014 - Draft environmental impact statement released | + | |
− | 2014 - Export permits granted | + | * Suppliers: The Cameron Interstate Pipeline connects the terminal to [[Trunkline Gas Company Pipeline]], [[Transcontinental Gas Pipe Line (Transco)]], [[Texas Eastern Transmission Gas Pipeline]] and the [[Tennessee Gas Pipeline]] |
− | 2014 - EPC contract awarded | + | * Customers: |
− | 2014 - FERC issues Final Environmental Impact Statement | + | ** GDF SUEZ will buy 4 million tons per annum (MTPA) |
− | 2014 - FID made | + | ** TEPCO will buy 800,000 tons per annum (MTPA) |
− | 2014 - Construction started | + | ** Toho Gas will buy 300,000 tons per annum |
− | Other Information | + | ** CPC of Taiwan will buy 0.8 million tons per annum |
+ | |||
+ | === History === | ||
+ | |||
+ | * 2012 - Foster Wheeler Wins Owner's Engineer Contract | ||
+ | * 2012 - GDF-Suez signs purchase agreement | ||
+ | * 2013 - Tepco signs a purchase contract | ||
+ | * 2013 - Sempra Energy, GDF SUEZ, Mitsubishi, Mitsui Sign Tolling Capacity, Joint-Venture Agreement | ||
+ | * 2014 - Draft environmental impact statement released | ||
+ | * 2014 - Export permits granted | ||
+ | * 2014 - EPC contract awarded | ||
+ | * 2014 - FERC issues Final Environmental Impact Statement | ||
+ | * 2014 - FID made | ||
+ | * 2014 - Construction started | ||
+ | * 2018 - Total becomes a shareholder | ||
+ | * 2019 - Train 1 begins operations | ||
+ | * 2020 - Train 3 begins operations | ||
+ | |||
+ | === Other Information === | ||
- | - | ||
− | |||
− | Tractebel Engineering LNG References | + | === Links === |
− | Foster Wheeler Wins Owner's Engineer Contract for LNG Liquefaction Facility in Louisiana | + | |
− | GDF SUEZ signs an agreement with Sempra Energyto access natural gas liquefaction capacity in the United States | + | # [[Long Term Applications Received by DOE/FE]] |
− | Purchase of Lean LNG from the U.S. Cameron Project Basic Agreement on the First Project to Secure 10 Million Lean LNG Annually | + | # [[LNG Terminals Using Air Products Technology]] |
− | Sempra Energy, GDF SUEZ, Mitsubishi, Mitsui Sign Tolling Capacity, Joint-Venture Agreements For Louisiana Liquefaction Export Facility | + | # [[Chiyoda Acid Gas Removal References]] |
− | GDF SUEZ to become a U.S. LNG exporter, with the Cameron LNG project | + | # [[Tractebel Engineering LNG References]] |
− | DEIS on Cameron LNG, LLC’s and Cameron Interstate Pipeline, LLC’s Liquefaction Project | + | # [http://killajoules.wikidot.com/blog:2443 Foster Wheeler Wins Owner's Engineer Contract for LNG Liquefaction Facility in Louisiana] |
− | Toho Gas in agreement with the U.S. Cameron Project for LNG purchase | + | # [http://killajoules.wikidot.com/blog:2475 GDF SUEZ signs an agreement with Sempra Energyto access natural gas liquefaction capacity in the United States] |
− | Sempra Energy Subsidiary Receives U.S. Department of Energy LNG Export License For Louisiana Liquefaction Facility | + | # [http://killajoules.wikidot.com/blog:3791 Purchase of Lean LNG from the U.S. Cameron Project Basic Agreement on the First Project to Secure 10 Million Lean LNG Annually] |
− | CB&I and Chiyoda Awarded Contract for LNG Liquefaction and Export Facilities | + | # [http://killajoules.wikidot.com/blog:4224 Sempra Energy, GDF SUEZ, Mitsubishi, Mitsui Sign Tolling Capacity, Joint-Venture Agreements For Louisiana Liquefaction Export Facility] |
− | First GDF SUEZ long term LNG sale to Asia with a 0.8 mtpa contract to CPC of Taiwan | + | # [http://killajoules.wikidot.com/blog:4213 GDF SUEZ to become a U.S. LNG exporter, with the Cameron LNG project] |
− | FERC issues Final Environmental Impact Statement on Cameron LNG | + | # [http://killajoules.wikidot.com/blog:4891 DEIS on Cameron LNG, LLC’s and Cameron Interstate Pipeline, LLC’s Liquefaction Project] |
− | First GDF SUEZ long term LNG sales to Japan | + | # [http://killajoules.wikidot.com/blog:4911 Toho Gas in agreement with the U.S. Cameron Project for LNG purchase] |
− | GDF SUEZ and its partners take Final Investment Decision for the Cameron LNG project | + | # [http://killajoules.wikidot.com/blog:4943 Sempra Energy Subsidiary Receives U.S. Department of Energy LNG Export License For Louisiana Liquefaction Facility] |
− | Cameron LNG Liquefaction Project Breaks Ground In Louisiana | + | # [http://killajoules.wikidot.com/blog:5019 CB&I and Chiyoda Awarded Contract for LNG Liquefaction and Export Facilities] |
− | Air Products Wins LNG Technology and Equipment Order for Louisiana Terminal Facility | + | # [http://killajoules.wikidot.com/blog:5056 First GDF SUEZ long term LNG sale to Asia with a 0.8 mtpa contract to CPC of Taiwan] |
− | # [] | + | # [http://killajoules.wikidot.com/blog:5140 FERC issues Final Environmental Impact Statement on Cameron LNG] |
+ | # [http://killajoules.wikidot.com/blog:5180 First GDF SUEZ long term LNG sales to Japan] | ||
+ | # [http://killajoules.wikidot.com/blog:5340 GDF SUEZ and its partners take Final Investment Decision for the Cameron LNG project] | ||
+ | # [http://killajoules.wikidot.com/blog:5524 Cameron LNG Liquefaction Project Breaks Ground In Louisiana] | ||
+ | # [http://killajoules.wikidot.com/blog:5721 Air Products Wins LNG Technology and Equipment Order for Louisiana Terminal Facility] | ||
+ | # [https://abarrelfull.blogspot.com/2022/01/total-closes-acquisition-of-engies.html Total Closes the acquisition of Engie’s Upstream LNG Business And Becomes World #2 LNG Player] | ||
+ | # [https://abarrelfull.blogspot.com/2022/01/cameron-lngs-train-1-begins-commercial.html Cameron LNG’s Train 1 Begins Commercial Operations] | ||
+ | # [https://lng-news.blogspot.com/2020/08/cameron-lng-train-3-begins-commercial.html Cameron LNG Train 3 Begins Commercial Operation] | ||
+ | |||
+ | [[category:LNG]] | ||
+ | [[category:USA]] | ||
+ | [[category:Sempra]] |
Latest revision as of 06:55, 14 February 2024
Contents
Summary Information
- Ownership: Sempra
- Website: https://cameronlng.com/
- Cameron LNG’s partners are Sempra Infrastructure, Mitsui & Co., Mitsubishi Corporation, TotalEnergies, and NYK Line
- Location: On the Calcasieu Channel, 18 miles from the Gulf of Mexico in Hackberry, Louisiana
- Capacity: 12.0 million tons/annum
- Status: In operation
Brief Description
- A conversion of the existing Cameron LNG Terminal into a large liquifaction terminal
- The project added three separate systems that liquefy natural gas; one 160,000-cubic-meter, full-containment LNG storage tank; refrigerant make-up and condensate product storage; a truck loading/unloading area; one marine work dock; minor modifications to existing terminal facilities; 21 miles of 42-inch-diameter pipeline; one 56,820-horsepower compressor station; and ancillary facilities.
Technical Details
- Storage capacity: Four full-containment storage tanks (4 x 160,000 cubic meters) (One additional tank)
- Constructor:
- Foster Wheeler: Owner's Engineer Contract
- Tractebel: review of FEED LNG liquefaction/process package
- CB&I and Chiyoda: Engineering, procurement and construction for the addition of natural gas liquefaction and export facilities
- Licence: Air Products
Ongoing Projects/Project Status
- The terminal was commissioned in 2019
- In 2016, Cameron LNG received all the regulatory approvals needed to expand the base 3-Train project. The Expansion Project, if undertaken, would include two additional liquefaction Trains (Trains No. 4 and No. 5) and up to two additional full containment LNG storage tanks.
Suppliers / Customers
- Suppliers: The Cameron Interstate Pipeline connects the terminal to Trunkline Gas Company Pipeline, Transcontinental Gas Pipe Line (Transco), Texas Eastern Transmission Gas Pipeline and the Tennessee Gas Pipeline
- Customers:
- GDF SUEZ will buy 4 million tons per annum (MTPA)
- TEPCO will buy 800,000 tons per annum (MTPA)
- Toho Gas will buy 300,000 tons per annum
- CPC of Taiwan will buy 0.8 million tons per annum
History
- 2012 - Foster Wheeler Wins Owner's Engineer Contract
- 2012 - GDF-Suez signs purchase agreement
- 2013 - Tepco signs a purchase contract
- 2013 - Sempra Energy, GDF SUEZ, Mitsubishi, Mitsui Sign Tolling Capacity, Joint-Venture Agreement
- 2014 - Draft environmental impact statement released
- 2014 - Export permits granted
- 2014 - EPC contract awarded
- 2014 - FERC issues Final Environmental Impact Statement
- 2014 - FID made
- 2014 - Construction started
- 2018 - Total becomes a shareholder
- 2019 - Train 1 begins operations
- 2020 - Train 3 begins operations
Other Information
-
Links
- Long Term Applications Received by DOE/FE
- LNG Terminals Using Air Products Technology
- Chiyoda Acid Gas Removal References
- Tractebel Engineering LNG References
- Foster Wheeler Wins Owner's Engineer Contract for LNG Liquefaction Facility in Louisiana
- GDF SUEZ signs an agreement with Sempra Energyto access natural gas liquefaction capacity in the United States
- Purchase of Lean LNG from the U.S. Cameron Project Basic Agreement on the First Project to Secure 10 Million Lean LNG Annually
- Sempra Energy, GDF SUEZ, Mitsubishi, Mitsui Sign Tolling Capacity, Joint-Venture Agreements For Louisiana Liquefaction Export Facility
- GDF SUEZ to become a U.S. LNG exporter, with the Cameron LNG project
- DEIS on Cameron LNG, LLC’s and Cameron Interstate Pipeline, LLC’s Liquefaction Project
- Toho Gas in agreement with the U.S. Cameron Project for LNG purchase
- Sempra Energy Subsidiary Receives U.S. Department of Energy LNG Export License For Louisiana Liquefaction Facility
- CB&I and Chiyoda Awarded Contract for LNG Liquefaction and Export Facilities
- First GDF SUEZ long term LNG sale to Asia with a 0.8 mtpa contract to CPC of Taiwan
- FERC issues Final Environmental Impact Statement on Cameron LNG
- First GDF SUEZ long term LNG sales to Japan
- GDF SUEZ and its partners take Final Investment Decision for the Cameron LNG project
- Cameron LNG Liquefaction Project Breaks Ground In Louisiana
- Air Products Wins LNG Technology and Equipment Order for Louisiana Terminal Facility
- Total Closes the acquisition of Engie’s Upstream LNG Business And Becomes World #2 LNG Player
- Cameron LNG’s Train 1 Begins Commercial Operations
- Cameron LNG Train 3 Begins Commercial Operation