Calder Gas Field
Revision as of 15:53, 30 October 2023 by Abarrelfull (talk | contribs)
Summary Information
- Operator: Harbour Energy
- Country: UK
- Location: East Irish Sea
- Production start:
- Partners: Harbour Energy - 100%
- Type: Gas
- Estimated Reserves:
- Production Volume:
+++ Description
- Calder in the East Irish Sea produces sour gas.
- It was developed with an unmanned platform and three development wells feeding to a producing platform and then through a pipeline to the Rivers Terminal at Barrow-in-Furness, which provides compression, hydrogen sulfide removal and metering.
- Options for developing the additional sour gas fields of Darwen, Crossens and Asland to feed into the Rivers Terminal will be considered once the Calder Field begins to decline.
+++ Contractors
- -
+++ History
- 2002 - Government approval granted
- 2004 - First gas produced
- 2019 - Chrysaor acquired Conocophillips's stake in the field
- 2021 - Premier Oil and Chrysaor merge to create Harbour Energy
+++ Geology
+++ Links