* Calcasieu Pass will have an export capacity of ten million (10,000,000) metric tonnes per year of liquefied natural gas and will accommodate ocean-going vessels with an LNG carrying capacity of up to 185,000 cubic meters. | * Calcasieu Pass will have an export capacity of ten million (10,000,000) metric tonnes per year of liquefied natural gas and will accommodate ocean-going vessels with an LNG carrying capacity of up to 185,000 cubic meters. | ||
+ | * The design is modular with eighteen * 0.626 MTPA liquefaction trains configured in 9 blocks | ||
* Also included on the project site will be two full containment LNG storage units, each with a usable capacity of approximately 200,000 cubic meters | * Also included on the project site will be two full containment LNG storage units, each with a usable capacity of approximately 200,000 cubic meters | ||
Revision as of 17:00, 15 November 2021
Contents
Summary Information
- Ownership: Venture Global
- Website: http://venturegloballng.com/
- Location: Cameron Parish, Louisiana
- Capacity: 10.0 million tons/annum
- Status: Planned
Brief Description
- Calcasieu Pass will have an export capacity of ten million (10,000,000) metric tonnes per year of liquefied natural gas and will accommodate ocean-going vessels with an LNG carrying capacity of up to 185,000 cubic meters.
- The design is modular with eighteen * 0.626 MTPA liquefaction trains configured in 9 blocks
- Also included on the project site will be two full containment LNG storage units, each with a usable capacity of approximately 200,000 cubic meters
Technical Details
- Storage capacity: 400,000 cubic meters
- Constructor:
- CB&I: Storage tanks
- Licensor:
Ongoing Projects/Project Status
- Commissioning is expected in 2022
Suppliers / Customers
- Suppliers: Gas is supplied to the terminal by the TransCameron Pipeline a 23.4-mile-long lateral Pipeline which brings feed gas from interconnections with ANR Pipeline Company (ANR), Texas Eastern Transmission Gas Pipeline, and Bridgeline Gas Pipeline System to the Terminal site.
- Customers:
History
- 2104 - Project announced
- 2017 - Storage tank contract awarded
- 2018 - FERC environmental impact assessment published
+++ Other Information
- -