Difference between revisions of "Cairo Refinery Project"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "Summary Information The project is also know as the Mostorod Refinery Project Ownership: Citadel Capital Website: http://www.citadelcapital.com/ Location: Near Cairo Capacity...")
 
Line 1: Line 1:
Summary Information
+
===Summary Information ===
 
The project is also know as the Mostorod Refinery Project
 
The project is also know as the Mostorod Refinery Project
  
Line 10: Line 10:
 
Expected Completion: 2015
 
Expected Completion: 2015
 
Budget: $3.0 Billion
 
Budget: $3.0 Billion
The Project
+
=== The Project ===
 
Project Type: New Facility
 
Project Type: New Facility
 
Project Summary: An upgrading facility to be built next to the existing Cairo Refinery and will use heavy products as feedstock.
 
Project Summary: An upgrading facility to be built next to the existing Cairo Refinery and will use heavy products as feedstock.
Line 18: Line 18:
 
Regulatory and environmental approvals for the project have been obtained and ERC has signed a lump-sum turnkey contract with GS Engineering & Construction / Mitsui & Co. The facility is expected to be fully operational by the end of 2015.
 
Regulatory and environmental approvals for the project have been obtained and ERC has signed a lump-sum turnkey contract with GS Engineering & Construction / Mitsui & Co. The facility is expected to be fully operational by the end of 2015.
 
The main part of the debt is expected to come from JBIC and Nexi with 40%. Kexim will provide 30% and the rest will come from the European Investment Bank (EIB) and African Development Bank (AfDB).
 
The main part of the debt is expected to come from JBIC and Nexi with 40%. Kexim will provide 30% and the rest will come from the European Investment Bank (EIB) and African Development Bank (AfDB).
Refining Units
+
=== Refining Units ===
 
The ERC facility will consist of a vacuum distillation unit, a hydro-cracking unit, naphtha and distillate hydro-treating units, a reforming unit, a hydrogen plant and a delayed coking unit.
 
The ERC facility will consist of a vacuum distillation unit, a hydro-cracking unit, naphtha and distillate hydro-treating units, a reforming unit, a hydrogen plant and a delayed coking unit.
 
one Hydrogen Production Unit (HPU) of 100,000 Nm3/h capacity;
 
one Hydrogen Production Unit (HPU) of 100,000 Nm3/h capacity;
Line 24: Line 24:
 
One Tail Gas Treatment unit (TGT) of 325 ton/day capacity;
 
One Tail Gas Treatment unit (TGT) of 325 ton/day capacity;
 
One Amine Processing Unit of 90 m3/h capacity.
 
One Amine Processing Unit of 90 m3/h capacity.
Terminal Capacity
+
=== Terminal Capacity ===
 
Crude Oil:
 
Crude Oil:
 
Refined Products:
 
Refined Products:
Crude Supply
+
=== Crude Supply ===
 
Will use heavy products from adjacent refinery.
 
Will use heavy products from adjacent refinery.
Products Produced
+
=== Products Produced ===
 
Diesel, jet fuel and naphtha
 
Diesel, jet fuel and naphtha
History
+
=== History ===
 
2007 - Mitsui and GS E&C signed Engineering, Procurement and Construction (EPC) contract
 
2007 - Mitsui and GS E&C signed Engineering, Procurement and Construction (EPC) contract
 
2010 - Mitsui signs $200 million loan agreement
 
2010 - Mitsui signs $200 million loan agreement
 
2012 - Maire Tecnimont signs contract for Hydrogen Production Unit, Sulphur Recovery Units, Tail Gas Treatment unit and Amine Processing Unit
 
2012 - Maire Tecnimont signs contract for Hydrogen Production Unit, Sulphur Recovery Units, Tail Gas Treatment unit and Amine Processing Unit
Other Information
+
=== Other Information ===
 
The political volatility is threatening to delay the project.
 
The political volatility is threatening to delay the project.
Relevant Links
+
=== Relevant Links ===
 
Project Web Page
 
Project Web Page
 
Mitsui and GS E&C signed US$1.8Bil Egypt refinery order
 
Mitsui and GS E&C signed US$1.8Bil Egypt refinery order

Revision as of 10:01, 31 January 2020

===Summary Information ===

The project is also know as the Mostorod Refinery Project

Ownership: Citadel Capital Website: http://www.citadelcapital.com/ Location: Near Cairo Capacity: 5.23 million tons/annum & 112,000 bbl/day Nelson Complexity: Project Stage: Preparation Expected Completion: 2015 Budget: $3.0 Billion

The Project

Project Type: New Facility Project Summary: An upgrading facility to be built next to the existing Cairo Refinery and will use heavy products as feedstock. Main Contractors: ERC has agreed an engineering, procurement and construction (EPC) contract for the project with a consortium formed between GS Engineering & Construction Corporation (GS) of South Korea and Mitsui & Company, Ltd. of Japan. Worley Parsons Ltd has been commissioned as the project management contractor on behalf of ERC for the construction program. Maire Tecnimont: Hydrogen Production Unit, Sulphur Recovery Units, Tail Gas Treatment unit, Amine Processing Unit The Egyptian Refining Company (ERC) is building a state-of-the-art US$ 3 billion greenfield second-stage oil refinery in the Greater Cairo Area, which will produce over 4 million tons of refined products, including over 2 million tons of EURO V diesel, the cleanest fuel of its type in the world. ERC’s production will be sold to the Egyptian General Petroleum Corporation (EGPC) under a 25-year offtake agreement at international prices. Regulatory and environmental approvals for the project have been obtained and ERC has signed a lump-sum turnkey contract with GS Engineering & Construction / Mitsui & Co. The facility is expected to be fully operational by the end of 2015. The main part of the debt is expected to come from JBIC and Nexi with 40%. Kexim will provide 30% and the rest will come from the European Investment Bank (EIB) and African Development Bank (AfDB).

Refining Units

The ERC facility will consist of a vacuum distillation unit, a hydro-cracking unit, naphtha and distillate hydro-treating units, a reforming unit, a hydrogen plant and a delayed coking unit. one Hydrogen Production Unit (HPU) of 100,000 Nm3/h capacity; Three Sulphur Recovery Units (SRU) of 162.5 ton/day capacity each; One Tail Gas Treatment unit (TGT) of 325 ton/day capacity; One Amine Processing Unit of 90 m3/h capacity.

Terminal Capacity

Crude Oil: Refined Products:

Crude Supply

Will use heavy products from adjacent refinery.

Products Produced

Diesel, jet fuel and naphtha

History

2007 - Mitsui and GS E&C signed Engineering, Procurement and Construction (EPC) contract 2010 - Mitsui signs $200 million loan agreement 2012 - Maire Tecnimont signs contract for Hydrogen Production Unit, Sulphur Recovery Units, Tail Gas Treatment unit and Amine Processing Unit

Other Information

The political volatility is threatening to delay the project.

Relevant Links

Project Web Page Mitsui and GS E&C signed US$1.8Bil Egypt refinery order News of Project Financing Awarded Contract of USD 1.8 billion for Overseas Plant Project Egypt ERC Hydrocracker Project Overview from IFC Overview from EIB Egypt's US$3.6bn refinery finance delay Signing of Loan Agreement for greenfield second-stage oil refinery in Mosorod, Egypt New Contracts For Maire Tecnimont In Oil, Gas & Petrochemical Business