Ca Ngu Vang Oil and Gas Field

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Operator: Hoan Vu Joint Operating Company (HVJOC)
  • Country: Vietnam
  • Location: Block 9-2
  • Production start: 2008
  • Partners: SOCO, Petrovietnam and PTTEP
  • Type: Oil and Gas
  • Estimated Reserves:
  • Production Volume:

+++ Description

  • Hydrocarbons from the CNV Field are transported via a 25 km subsea pipeline system to Bach Ho's processing facilities. Crude oil is processed, stored in a Floating Storage and Offloading vessel and then transported to oil refineries. Wet gas separated offshore is transported to an onshore gas facility for further distribution to meet domestic demand of natural gas, LPG and condensate.

+++ Contractors

  • **Clough:** transportation, installation and commissioning of two 26 kilometre subsea pipelines
  • **CTI:** Complete pipeline, tie-in spool and riser design and drawings during the FEED through the detailed design phases of the CNV Field Development Project

+++ History

  • 2006 - Declaration of Commerciality
  • 2008 - CNV Field Produces First Oil
  • 2010 - Beginning of Phase II Development Drilling

+++ Geology

+++ Links

  1. CLIENT: Hoan Vu Joint Operating Company
  2. Ca Ngu Vang Field Development Project, CTI
  3. CNV Field Produces First Oil
  4. Declaration of Commerciality for the Ca Ngu Vang Field
  5. Drilling Result of exploration well COD-2X, Block 9-2 in Vietnam Project
  6. Beginning of Phase II Development Drilling on Ca Ngu Vang