CUEL Platform References

From A Barrel Full
Jump to navigation Jump to search


  1. Awarded for CTEP Phase 49-50, 2014
  2. Awarded for CTEP Phase 47-48, 2013
  3. Ichthys Gas Field
    • JKC Ichthys
    • Onshore module fabrication
    • Australia
    • 2012
  4. Awarded for CTEP Phase 45-46- 2012
  5. Bumi Bulan and Suriya Gas Fields
    • Carigali-HESS
    • Bulan B Project
    • 2012
  6. 100th Chevron platform loads out, 2011
  7. Largest jacket fabrication and sail away (ESSOL D1), 2011
  8. Awarded for CTEP Phase 43-44, 2011
  9. Awarded for IHI Mid Water Arch, 2011
  10. Awarded for CTEP Phase 41-42, 2010
  11. Bumi Bulan and Suriya Gas Fields
    • Carigali-HESS
    • Suriya B Project
    • 2010
  12. D1 Oil and Gas Field
    • ONGC
    • D1 Development Project
    • 2010

2009


100th offshore facilities load out


Awarded the PTTEP Arthit 1C Project


Awarded for CTEP Phase 36-37


Awarded for CTEP Phase 39


Awarded for Salamander Bualuang Brownfield


Awarded for CPOC Muda D WHP

2008


Awarded for CTEP Phase 35


Awarded for BG India - Hydra PK & SWP Project

2007


Awarded for CTEP Phase 33-34


Awarded for COTL Stage 5


Awarded for Pearl Oil (Mubadala) Jasmine D Development


Awarded for Pearl Oil (Mubadala) Banyen A Development


Awarded for CPOC - Phase I Development


Awarded for Reliance - Dhirubhai 1 & 3 Development Project


Awarded for Hindustan PY 1 Development Project

2006


Awarded the PTTEP Arthit LQ Emtunga project, the 1st LQ fabricated in Thailand


Awarded for CTEP Phase 32


Awarded for COTL Stage 4


Awarded for COTL Stage BWC


Awarded for Pearl Oil (Mubadala) Jasmine B2 Development


Awarded for Pearl Oil (Mubadala) Jasmine A, B and C Brownfield


Awarded Carigali-HESS - Cakerawala Phase II Development


Awarded for BG NRPOD India

2005


Awarded for Unocal - Surat Trunkline


Awarded for Unocal Phase 29-30


Awarded for Unocal - Pailin Pipeline Replacement


Awarded for COTL Stage 3B


Awarded for CTEP Phase 31


Awarded for Pearl Oil (Mubadala) Jasmine B Development

2004


Awarded for Unocal Phase 27-28

  1. Erawan Gas Field
    • Unocal
    • Erawan Mercury Removal Platform (ERMRP)
    • 2004


Awarded for COTL Stage 3A


Awarded for Pearl Oil (Mubadala) Jasmine C Development


Awarded for PTTEP WP9 & WP10 Revamp Project

2003


Awarded for the Unocal Platong Oil Central Processing Platform II


Awarded for Unocal Phase 25-26


Awarded for Pearl Oil (Mubadala) Jasmine Field Development Phase 1

2002


Awarded for Unocal Phase 23-24


Awarded for GSPC- Hazira Offshore Development Project

2001


Awarded for Unocal Big-Oil Oil Export System


Awarded for PTT-24’’ Gas Export Pipeline (North Pailin Export Line)

2000


Awarded for the Unocal Platong Oil Central Processing Platform, the 1st CPP fabricated in Thailand


Awarded for GSPC- Hazira Offshore Development Project


Awarded for Unocal Phase 21/6


Awarded for Unocal Phase 22