Abarrelfull (talk | contribs) (Created page with "=== Summary Information === * Operator: Total * Country: Angola * Location: Block 17 * Production start: 2014 * Partners: Total - 40%, Statoil (23.33%), Esso (Block 17) Li...") |
Abarrelfull (talk | contribs) |
||
Line 16: | Line 16: | ||
=== Contractors === | === Contractors === | ||
− | * | + | ==== Phase 1 ==== |
+ | * '''Daewoo Shipbuilding & Marine Eng. Co. Ltd. (DSME):''' Engineering, procurement, installation and construction of FPSO | ||
* **KBR:** Detailed design of topsides | * **KBR:** Detailed design of topsides | ||
* **Technip:** 76 kilometers of dynamic and static production and water injection umbilicals | * **Technip:** 76 kilometers of dynamic and static production and water injection umbilicals | ||
* **Subsea 7:** Engineering, procurement, fabrication and installation of 130km of pipes | * **Subsea 7:** Engineering, procurement, fabrication and installation of 130km of pipes | ||
* **FMC Technologies:** | * **FMC Technologies:** | ||
− | + | ** Fabrication, assembly and testing of 36 wellhead systems and 19 subsea trees | |
− | + | ** Manufacture of 7 complete manifold systems | |
− | + | ** Critical equipment testing, offshore installation support and equipment refurbishment | |
* **Vallourec:** Supply of 28,500 tons - or 200 km - of coated seamless line pipes and bends | * **Vallourec:** Supply of 28,500 tons - or 200 km - of coated seamless line pipes and bends | ||
* **JDR Cable Systems:** Design, manufacture and testing of 9 umbilical and reeler systems | * **JDR Cable Systems:** Design, manufacture and testing of 9 umbilical and reeler systems |
Revision as of 07:19, 3 December 2021
Summary Information
- Operator: Total
- Country: Angola
- Location: Block 17
- Production start: 2014
- Partners: Total - 40%, Statoil (23.33%), Esso (Block 17) Limited (20%) and BP (16.67%).
- Type: Oil & Gas
- Estimated Reserves: The proved and probable reserves are estimated at approximately 500 million barrels of oil
- Production Volume:
Description
- The development consists of four fields, Cravo, Lirio, Orquidea and Violeta
- These fields are located in Block 17 offshore Angola in water depths of 1,100 to 1,400 m
- The project comprises 34 wells and 8 manifolds connected by 180 km of subsea pipelines to the [[[Clov FPSO]]] unit
- The gas produced on CLOV will be exported via a subsea line to the onshore [[[Angola Soyo LNG Terminal]]] liquefaction plant
Contractors
Phase 1
- Daewoo Shipbuilding & Marine Eng. Co. Ltd. (DSME): Engineering, procurement, installation and construction of FPSO
- **KBR:** Detailed design of topsides
- **Technip:** 76 kilometers of dynamic and static production and water injection umbilicals
- **Subsea 7:** Engineering, procurement, fabrication and installation of 130km of pipes
- **FMC Technologies:**
- Fabrication, assembly and testing of 36 wellhead systems and 19 subsea trees
- Manufacture of 7 complete manifold systems
- Critical equipment testing, offshore installation support and equipment refurbishment
- **Vallourec:** Supply of 28,500 tons - or 200 km - of coated seamless line pipes and bends
- **JDR Cable Systems:** Design, manufacture and testing of 9 umbilical and reeler systems
- **KWsubsea:** Lateral buckling and pipeline walking assessment and mitigation design for pipeline systems
History
- 2010 - FMC awarded subsea production equipment contract
- 2010 - KBR awarded topsides contract
- 2011 - Technip awarded umbilical contracts
- 2013 - The FPSO arrived in Angola
- 2014 - CLOV begins production
Geology
- The development will produce two types of oil: one with a 32 to 35° API gravity from the Oligocene reservoirs (Cravo-Lirio) and the other, more viscous, with a 20 to 30° API gravity from the Miocene reservoirs (Orquidea-Violeta)
Links
- Saipem Africa Pipeline References
- Serimax Pipeline References
- KWsubsea Deepwater Project Highlights References
- Acergy S.A. awarded $1.3 billion contract for deepwater development offshore West Africa
- Angola: Total Launches CLOV Development on Block 17
- FMC Technologies Awarded $520 Million Order for Total's CLOV Development
- JDR To Supply FMC With (IWOC) Umbilical And Reeler Systems For The CLOV Project
- KBR to Execute Topsides Detailed Design for TOTAL's CLOV FPSO
- Technip awarded umbilical contracts in Angola
- Vallourec provides Total with a wide range of premium offshore solutions off the Angolan coast