(Created page with "=== Summary Information === * Operator: Total * Country: Angola * Location: Block 17 * Production start: 2014 * Partners: Total - 40%, Statoil (23.33%), Esso (Block 17) Li...")
 
Line 16: Line 16:
  
 
=== Contractors ===
 
=== Contractors ===
* **Daewoo Shipbuilding & Marine Eng. Co. Ltd. (DSME):** Engineering, procurement, installation and construction of FPSO
+
==== Phase 1 ====
 +
* '''Daewoo Shipbuilding & Marine Eng. Co. Ltd. (DSME):''' Engineering, procurement, installation and construction of FPSO
 
* **KBR:** Detailed design of topsides  
 
* **KBR:** Detailed design of topsides  
 
* **Technip:** 76 kilometers of dynamic and static production and water injection umbilicals
 
* **Technip:** 76 kilometers of dynamic and static production and water injection umbilicals
 
* **Subsea 7:** Engineering, procurement, fabrication and installation of 130km of pipes
 
* **Subsea 7:** Engineering, procurement, fabrication and installation of 130km of pipes
 
* **FMC Technologies:**  
 
* **FMC Technologies:**  
* Fabrication, assembly and testing of 36 wellhead systems and 19 subsea trees
+
** Fabrication, assembly and testing of 36 wellhead systems and 19 subsea trees
* Manufacture of 7 complete manifold systems
+
** Manufacture of 7 complete manifold systems
* Critical equipment testing, offshore installation support and equipment refurbishment
+
** Critical equipment testing, offshore installation support and equipment refurbishment
 
* **Vallourec:** Supply of 28,500 tons - or 200 km - of coated seamless line pipes and bends   
 
* **Vallourec:** Supply of 28,500 tons - or 200 km - of coated seamless line pipes and bends   
 
* **JDR Cable Systems:** Design, manufacture and testing of 9 umbilical and reeler systems
 
* **JDR Cable Systems:** Design, manufacture and testing of 9 umbilical and reeler systems

Revision as of 07:19, 3 December 2021

Summary Information

  • Operator: Total
  • Country: Angola
  • Location: Block 17
  • Production start: 2014
  • Partners: Total - 40%, Statoil (23.33%), Esso (Block 17) Limited (20%) and BP (16.67%).
  • Type: Oil & Gas
  • Estimated Reserves: The proved and probable reserves are estimated at approximately 500 million barrels of oil
  • Production Volume:

Description

  • The development consists of four fields, Cravo, Lirio, Orquidea and Violeta
  • These fields are located in Block 17 offshore Angola in water depths of 1,100 to 1,400 m
  • The project comprises 34 wells and 8 manifolds connected by 180 km of subsea pipelines to the [[[Clov FPSO]]] unit
  • The gas produced on CLOV will be exported via a subsea line to the onshore [[[Angola Soyo LNG Terminal]]] liquefaction plant

Contractors

Phase 1

  • Daewoo Shipbuilding & Marine Eng. Co. Ltd. (DSME): Engineering, procurement, installation and construction of FPSO
  • **KBR:** Detailed design of topsides
  • **Technip:** 76 kilometers of dynamic and static production and water injection umbilicals
  • **Subsea 7:** Engineering, procurement, fabrication and installation of 130km of pipes
  • **FMC Technologies:**
    • Fabrication, assembly and testing of 36 wellhead systems and 19 subsea trees
    • Manufacture of 7 complete manifold systems
    • Critical equipment testing, offshore installation support and equipment refurbishment
  • **Vallourec:** Supply of 28,500 tons - or 200 km - of coated seamless line pipes and bends
  • **JDR Cable Systems:** Design, manufacture and testing of 9 umbilical and reeler systems
  • **KWsubsea:** Lateral buckling and pipeline walking assessment and mitigation design for pipeline systems

History

  • 2010 - FMC awarded subsea production equipment contract
  • 2010 - KBR awarded topsides contract
  • 2011 - Technip awarded umbilical contracts
  • 2013 - The FPSO arrived in Angola
  • 2014 - CLOV begins production

Geology

  • The development will produce two types of oil: one with a 32 to 35° API gravity from the Oligocene reservoirs (Cravo-Lirio) and the other, more viscous, with a 20 to 30° API gravity from the Miocene reservoirs (Orquidea-Violeta)

Links

  1. Saipem Africa Pipeline References
  2. Serimax Pipeline References
  3. KWsubsea Deepwater Project Highlights References
  4. Acergy S.A. awarded $1.3 billion contract for deepwater development offshore West Africa
  5. Angola: Total Launches CLOV Development on Block 17
  6. FMC Technologies Awarded $520 Million Order for Total's CLOV Development
  7. JDR To Supply FMC With (IWOC) Umbilical And Reeler Systems For The CLOV Project
  8. KBR to Execute Topsides Detailed Design for TOTAL's CLOV FPSO
  9. Technip awarded umbilical contracts in Angola
  10. Vallourec provides Total with a wide range of premium offshore solutions off the Angolan coast
  11. CLOV Start Up In Angola: Total Increases Block 17 Production To 700,000 Barrels Per Day
  12. Inauguration of CLOV in Angola