Difference between revisions of "Buna SOW Leuna Refinery"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 24: | Line 24: | ||
=== Products Produced === | === Products Produced === | ||
* Gasoline, Diesel, Heating Oil | * Gasoline, Diesel, Heating Oil | ||
+ | * Methanol, of which it is Europe’s second-largest producer | ||
+ | |||
=== Projects === | === Projects === | ||
* A decision was made in 2007 to build a new desulphurisation unit in the Leuna refinery in order to supply the German market with low-sulphur heating oil. | * A decision was made in 2007 to build a new desulphurisation unit in the Leuna refinery in order to supply the German market with low-sulphur heating oil. |
Revision as of 15:58, 17 March 2022
Contents
Summary Information
- Ownership: Total
- Website: http://www.total.com/
- List of Total Refineries
- Location: Saxony-Anhalt
- Capacity: 12 million tons/annum & 240.000 bbl/day
- Nelson Complexity: 6.4
Refining Units
- Crude distillation unit: 230,000
- vacuum distillation units: 110,000
- Alkylation Unit
- catalytic reforming unit: 20,000
- hydrogeneration cracker: 74,000
- Hydrocracker:
- catalytic cracker unit: 60,000
- visbreaker unit: 28,800
- Diesel Desulphurisation
Terminal Capacity
- Crude Oil: The tank farm for storing crude oil houses ten tanks, each with a storage capacity of 30,000 cubic meters
- Refined Products:
Crude Supply
- Crude oil is supplied through the Druzhba Pipeline from Russia
Products Produced
- Gasoline, Diesel, Heating Oil
- Methanol, of which it is Europe’s second-largest producer
Projects
- A decision was made in 2007 to build a new desulphurisation unit in the Leuna refinery in order to supply the German market with low-sulphur heating oil.
Other Information
- The refinery replaced the two outdated refineries of Leuna and Zeitz
History
- 1997 - The TOTAL refinery went into operation after three years of construction
- 2007 - Kerosene hydro-desulphurization project launched
- 2014 - Revamp of alkylation plant completed