Difference between revisions of "Bu Hasa Oil Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: ADNOC * Country: UAE * Location: 200 Km South-West of the Abu Dhabi City * Production start: * Partners: * Type: Oil / Gas * Estimated Reser...") |
Abarrelfull (talk | contribs) |
||
Line 13: | Line 13: | ||
* Bu Hasa is located onshore, 200 Km South-West of the Abu Dhabi City | * Bu Hasa is located onshore, 200 Km South-West of the Abu Dhabi City | ||
* The field utilises water and gas injection EOR techniques | * The field utilises water and gas injection EOR techniques | ||
− | * | + | * [[Associated Gas]] is treated at the [[Bu Hasa Gas Processing Plant]] |
* Oil is pumped to Jebel Dhana Terminal | * Oil is pumped to Jebel Dhana Terminal | ||
Latest revision as of 16:40, 13 October 2023
Summary Information
- Operator: ADNOC
- Country: UAE
- Location: 200 Km South-West of the Abu Dhabi City
- Production start:
- Partners:
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
+++ Description
- In terms of proven oil reserves, Buhasa is one of the top twenty fields in the world
- Bu Hasa is located onshore, 200 Km South-West of the Abu Dhabi City
- The field utilises water and gas injection EOR techniques
- Associated Gas is treated at the Bu Hasa Gas Processing Plant
- Oil is pumped to Jebel Dhana Terminal
+++ Contractors
- **Saipem:** FEED for Upgrade of Bu Hasa Production Facilities
- **Punj Lloyd:** Flowlines & WellHeads
+++ History
- 1962 - Bu Hasa Oil Field discovered
- 1970 - Water injection introduced
- 1995 - Commissioned The North Gas Injection Plant.
- 2016 - BP became a 10% shareholder
+++ Geology
- The Bu Hasa Oil Field produces from the Shuaiba and Thamama Formations
+++ Links