Brunsbüttel Floating LNG Terminal
Revision as of 09:35, 8 January 2024 by Abarrelfull (talk | contribs)
Contents
Summary Information
- Ownership: Elbehafen LNG
- Website: https://www.rwe.com/en/
- Location: Elbehafen, Brunsbüttel, Germany
- Capacity: 6.0 million tons/annum
- Status: In operation
Brief Description
- The FSRU is 300-metre-long, capable of taking on up to 170,000 cubic metres of LNG from tankers in a single unloading operation
- Phase 1 of the project will use Brunsbüttel Ports' existing dangerous goods jetty
- Phase 2 is expected to start in autumn 2023 and will involve the use of a newly built jetty to the west of the Elbehafen.
- Phase 3 involves the construction of a new gas connection pipeline "ET180", which will enable supply of 7.5 BCM per annum
Technical Details
- Storage capacity:
- Unloading capacity:
- Send out capacity:
- Constructor:
Ongoing Projects/Project Status
- In operation
Suppliers / Customers
- Suppliers: Conocophillips will supply 2.0 mtpa from the Qatargas North Field Extension LNG Terminal Project
- Customers:
History
- 2022 - The vessel was contracted from Hoegh LNG
- 2022 - Qatarenergy, Conocophillips Sign Long-Term Supply agreement for the terminal
- 2023 - First cargo delivered
- 2024 - KN took over management of the terminal
Other Information
-