Difference between revisions of "Brazil Route 2 Gas Pipeline"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "Summary Information * Source: Santos Basin * Destination: Cabiúnas Gas Treatment Terminal * Ownership: Petrobras * Website: http://www.petrobras.com.br/ * Length: 401 kilom...")
 
 
Line 11: Line 11:
 
+++ Details
 
+++ Details
 
* Ranging over a total distance of 401 km, Route 2 is the longest submarine pipeline in operation in Brazil and can transport 13 million cubic meters of gas per day, connecting the pre-salt Santos Basin production systems to the Cabiúnas Gas Treatment Terminal, in Macaé, Rio de Janeiro
 
* Ranging over a total distance of 401 km, Route 2 is the longest submarine pipeline in operation in Brazil and can transport 13 million cubic meters of gas per day, connecting the pre-salt Santos Basin production systems to the Cabiúnas Gas Treatment Terminal, in Macaé, Rio de Janeiro
* The Route 2 pipeline interconnects with the [[[Brazil Route 1 Gas Pipeline]]]
+
* The Route 2 pipeline interconnects with the [[Brazil Route 1 Gas Pipeline]]
  
 
+++ History
 
+++ History

Latest revision as of 12:02, 16 February 2024

Summary Information

  • Source: Santos Basin
  • Destination: Cabiúnas Gas Treatment Terminal
  • Ownership: Petrobras
  • Website: http://www.petrobras.com.br/
  • Length: 401 kilometres ( miles)
  • Capacity: 13 MCM per day
  • Status: Operating

+++ Details

  • Ranging over a total distance of 401 km, Route 2 is the longest submarine pipeline in operation in Brazil and can transport 13 million cubic meters of gas per day, connecting the pre-salt Santos Basin production systems to the Cabiúnas Gas Treatment Terminal, in Macaé, Rio de Janeiro
  • The Route 2 pipeline interconnects with the Brazil Route 1 Gas Pipeline

+++ History

  • 2016 - The pipeline began operating

+++ Other Information

  • -

+++ Links

  1. FPSO Cidade de Maricá goes into operation in the Santos Basin pre-salt cluster