Bonga FPSO
Jump to navigation
Jump to search
Summary Information
- Name: Bonga FPSO
- Field: Bonga Oil and Gas Field
- Country: Nigeria
- Ownership:
- Website:
- Field Operated By: Shell
- Capacity: 225,000 bpd
- Year of Completion:
+++ Brief Description
- The FPSO, measures over 300 metres long, 75 metres wide and 33 metres tall. The Bonga FPSO can extract and process up to 225,000 barrels of oil a day and store up to 2 million barrels of oil. It also has a gas export facility of 150 million standard cubic feet per day
+++ Contractors
- **AMEC:** FPSO Engineering Procurement Construction contract
- **Samsung Heavy Industries(SHI):** FPSO hull construction
- **Heerema:** EPCI for 7 Topsides Modules
- **ABB:** Electrical Systems
+++ Status
- In operation
+++ History
- 2001 - AMEC was awarded the Engineering Procurement Construction contract
- 2002 - FPSO Bonga leaves SHI yard in Korea
- 2003 - The Bonga FPSO sets sail for Nigeria
+++ Other Information
- -