Bleo Holm FPSO

From A Barrel Full
Jump to navigation Jump to search

Summary Information

+++ Brief Description

  • Gross liquids capacity is 126 MBPD and dry oil production capacity 100 MBPD.
  • Water treatment capacity is 125 MBPD
  • Gas compression capacity is 58 MMSCFD
  • Water-injection capacity is 140 MBPD
  • The living quarters have capacity for 90 people

+++ Contractors

  • **Bluewater:**
    • Vessel Design
    • Internal Turret
  • **Hitachi:** Vessel construction
  • **Fluor / United Industrial Enterprise:** Engineering, procurement, and construction (EPC) of the process facility storage and offloading unit. The process facilities include oil/water separation, gas compression, seawater treatment, and seawater injection into the reservoir.
  • **Saipem:** FPSO topsides - EPIC
  • **BiFab:** Design and Manufacture of a 90 Man Living Quarters
  • **Nessco:** Communication systems

+++ Status

  • In operation

+++ History

  • 2001 - Production started on the Blake field following modifications
  • 2007 - Fatal accident on the vessel

+++ Other Information

  • -

+++ Links

  1. Bluewater Mooring References
  2. International Protective Coatings FPSO References
  3. Nessco FPSO References
  4. Saipem Fixed Offshore Production Facilities Project References
  5. Bluewater Engineering - Bleo Holm FPSO Process Facility - EPC
  6. FPSO technology benefits Ross and Blake oil fields
  7. Incident on FPSO Bleo Holm