Difference between revisions of "Bijupira-Salema Oil and Gas Field"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "Summary Information * Operator: Shell * Country: Brazil * Location: Campos Basin * Production start: 2003 * Partners: * Type: Oil & Gas * Estimated Reserves: * Production V...")
 
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
Summary Information
+
=== Summary Information ===
 
* Operator: Shell  
 
* Operator: Shell  
 
* Country: Brazil
 
* Country: Brazil
Line 9: Line 9:
 
* Production Volume:  
 
* Production Volume:  
  
+++ Description
+
=== Description ===
 
* The Bijupira and Salema fields are located adjacent to each other in the Campos Basin, some 175 miles from Rio de Janeiro, in water depths ranging from approximately 470 to 800 meters.  
 
* The Bijupira and Salema fields are located adjacent to each other in the Campos Basin, some 175 miles from Rio de Janeiro, in water depths ranging from approximately 470 to 800 meters.  
 
* Artificial lift is required to raise the reservoir fluids to the surface for processing. Reservoir pressure will be maintained by injection of seawater at high pressure to assist oil recovery
 
* Artificial lift is required to raise the reservoir fluids to the surface for processing. Reservoir pressure will be maintained by injection of seawater at high pressure to assist oil recovery
* The [[[Fluminense FPSO]]] has an oil processing capacity of 81,000 barrels of oil per day, gas handling of 75 million cubic feet per day, water injection of 92,000 barrels per day and storage capacity of 1.2 million barrels
+
* The [[Fluminense FPSO]] has an oil processing capacity of 81,000 barrels of oil per day, gas handling of 75 million cubic feet per day, water injection of 92,000 barrels per day and storage capacity of 1.2 million barrels
 
* The FPSO receives hydrocarbons from the subsea wells, gathered around two centers on the seabed some 3 miles (5 km) apart and can process up to 70,000 bopd.  
 
* The FPSO receives hydrocarbons from the subsea wells, gathered around two centers on the seabed some 3 miles (5 km) apart and can process up to 70,000 bopd.  
 
* The Bijupira Salema development has a total of three production and two water-injection manifolds. The FPSO’s turret has space for 15 risers, three umbilicals and two spare slots. The vessel is secured to the seabed by nine mooring lines, giving the vessel the ability to weathervane.  
 
* The Bijupira Salema development has a total of three production and two water-injection manifolds. The FPSO’s turret has space for 15 risers, three umbilicals and two spare slots. The vessel is secured to the seabed by nine mooring lines, giving the vessel the ability to weathervane.  
 
* A re-development is underway that includes the drilling of four new production wells, to boost production volumes
 
* A re-development is underway that includes the drilling of four new production wells, to boost production volumes
  
+++ Contractors
+
=== Contractors ===
 
* **Modec:**  Supply of a Floating, Production, Storage and Offloading (FPSO) vessel, external turret mooring system, flowlines, risers and five Subsea manifolds  
 
* **Modec:**  Supply of a Floating, Production, Storage and Offloading (FPSO) vessel, external turret mooring system, flowlines, risers and five Subsea manifolds  
 
* **Jurong Shipyard:** FPSO Conversion
 
* **Jurong Shipyard:** FPSO Conversion
Line 23: Line 23:
 
* **Manatee:** Installation supervision of eight trees
 
* **Manatee:** Installation supervision of eight trees
  
+++ History
+
==== Decommissioning ====
 +
* Subsea 7: disconnection, recovery, and disposal of 10 flexible risers, three umbilicals and nine mooring lines.
 +
 
 +
=== History ===
 
* 1990 - The Bijupira and Salema Fields were discovered
 
* 1990 - The Bijupira and Salema Fields were discovered
 
* 2003 - First oil produced
 
* 2003 - First oil produced
 
* 2013 - A re-development project launched
 
* 2013 - A re-development project launched
 +
* 2015 - petrobras sold its stake to PetroRio S.A.
 +
* 2023 - Subsea 7 awarded decommissioning contract for the field
  
+++ Geology
+
=== Geology ===
 
*  
 
*  
  
+++ Links
+
=== Links ===
 
# [http://www.fmctechnologies.com/SubseaSystems/GlobalProjects/South%20America/Brazil/ShellBijupiraSalema.aspx Shell (Enterprise) Bijupira Salema (FMC)]
 
# [http://www.fmctechnologies.com/SubseaSystems/GlobalProjects/South%20America/Brazil/ShellBijupiraSalema.aspx Shell (Enterprise) Bijupira Salema (FMC)]
 +
# [[Fiberbond Offshore Platform References]]
 
# [[Manatee Offshore References]]
 
# [[Manatee Offshore References]]
# [[Fiberbond Offshore Platform References]]
 
 
# [http://killajoules.wikidot.com/archive:bijupira-and-salema-fields-offshore-brazil-achieve-f Bijupira and Salema Fields Offshore Brazil Achieve First Oil]
 
# [http://killajoules.wikidot.com/archive:bijupira-and-salema-fields-offshore-brazil-achieve-f Bijupira and Salema Fields Offshore Brazil Achieve First Oil]
 
# [http://killajoules.wikidot.com/archive:sembcorp-marine-s-subsidary-jurong-shipyard-achieves SembCorp Marine's Subsidary Jurong Shipyard Achieves Construction Completion of FPSO Fluminense on Schedule]
 
# [http://killajoules.wikidot.com/archive:sembcorp-marine-s-subsidary-jurong-shipyard-achieves SembCorp Marine's Subsidary Jurong Shipyard Achieves Construction Completion of FPSO Fluminense on Schedule]
 
# [http://killajoules.wikidot.com/blog:4423 Shell to boost deepwater production in Brazil]
 
# [http://killajoules.wikidot.com/blog:4423 Shell to boost deepwater production in Brazil]
 +
# [https://abarrelfull.blogspot.com/2021/12/sale-of-interest-in-concessions-of.html Sale of Interest in Concessions of Bijupirá and Salema]
 +
# [https://a-barrel-full.blogspot.com/2023/11/subsea7-awarded-decommissioning.html Subsea7 awarded decommissioning contract in Brazil]
  
 
[[category:Field]]
 
[[category:Field]]
 
[[category:Brazil]]
 
[[category:Brazil]]
 
[[category:Shell]]
 
[[category:Shell]]

Latest revision as of 10:09, 21 November 2023

Summary Information

  • Operator: Shell
  • Country: Brazil
  • Location: Campos Basin
  • Production start: 2003
  • Partners:
  • Type: Oil & Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • The Bijupira and Salema fields are located adjacent to each other in the Campos Basin, some 175 miles from Rio de Janeiro, in water depths ranging from approximately 470 to 800 meters.
  • Artificial lift is required to raise the reservoir fluids to the surface for processing. Reservoir pressure will be maintained by injection of seawater at high pressure to assist oil recovery
  • The Fluminense FPSO has an oil processing capacity of 81,000 barrels of oil per day, gas handling of 75 million cubic feet per day, water injection of 92,000 barrels per day and storage capacity of 1.2 million barrels
  • The FPSO receives hydrocarbons from the subsea wells, gathered around two centers on the seabed some 3 miles (5 km) apart and can process up to 70,000 bopd.
  • The Bijupira Salema development has a total of three production and two water-injection manifolds. The FPSO’s turret has space for 15 risers, three umbilicals and two spare slots. The vessel is secured to the seabed by nine mooring lines, giving the vessel the ability to weathervane.
  • A re-development is underway that includes the drilling of four new production wells, to boost production volumes

Contractors

  • **Modec:** Supply of a Floating, Production, Storage and Offloading (FPSO) vessel, external turret mooring system, flowlines, risers and five Subsea manifolds
  • **Jurong Shipyard:** FPSO Conversion
  • **FMC Technologies:** Supply of flowlines, riser system, controls, manifolds and tie-in systems
  • **Manatee:** Installation supervision of eight trees

Decommissioning

  • Subsea 7: disconnection, recovery, and disposal of 10 flexible risers, three umbilicals and nine mooring lines.

History

  • 1990 - The Bijupira and Salema Fields were discovered
  • 2003 - First oil produced
  • 2013 - A re-development project launched
  • 2015 - petrobras sold its stake to PetroRio S.A.
  • 2023 - Subsea 7 awarded decommissioning contract for the field

Geology

Links

  1. Shell (Enterprise) Bijupira Salema (FMC)
  2. Fiberbond Offshore Platform References
  3. Manatee Offshore References
  4. Bijupira and Salema Fields Offshore Brazil Achieve First Oil
  5. SembCorp Marine's Subsidary Jurong Shipyard Achieves Construction Completion of FPSO Fluminense on Schedule
  6. Shell to boost deepwater production in Brazil
  7. Sale of Interest in Concessions of Bijupirá and Salema
  8. Subsea7 awarded decommissioning contract in Brazil