Bibby Offshore Subsea References

From A Barrel Full
Jump to navigation Jump to search

2012

  1. Greater Alwyn Oil and Gas Fields
    • United Kingdom
    • TOTAL
    • Ellon & Grant Nuggets Well Restart
    • 2012
  2. Lochranza Oil Field
    • United Kingdom
    • Maersk
    • Lochranza & IRM
    • 2012
  3. Athena Oil Field
    • United Kingdom
    • Ithaca Energy,
    • Athena Field Development
    • 2012
  4. Eider Oil Field
    • United Kingdom
    • TAQA,
    • Otter IRM
  5. Montrose Arbroath Oil and Gas Field
    • United Kingdom
    • Talisman
    • Arkwright Riser Replacement Project
  6. Ettrick Oil and Gas Field
    • United Kingdom
    • Nexen
    • Ettrick IRM
  7. Caister Murdoch Gas Fields
    • United Kingdom
    • E-On
    • Hunter Flowline Isolation
  8. Ninian Oil Field
    • United Kingdom
    • CNR
    • Lyell
  9. Janice Oil Field
    • United Kingdom
    • Maersk
    • Janice Riser Reconfiguration
  10. Petrojarl Banff FPSO
    • United Kingdom
    • Teekay
    • Banff & Kyle valve isolation and umbilical preservation
  11. Thames Gas Field
    • United Kingdom
    • Perenco
    • Arthur
  12. Gryphon FPSO
    • United Kingdom
    • Maerk
    • Gryphon, area re-instatement programme.
  13. Fife, Fergus, Flora and Angus Oil Fields
    • United Kingdom
    • HESS
    • FFFA Decommissioning
  14. Breagh A Gas Field
    • United Kingdom
    • Allseas
    • Breagh "A" Development
  15. Fairfield Energy,IRM 2012
  16. Apache Forties
  17. ConocoPhillips M10 Tie-Ins
  18. E-On Huntington / Johnston K


2011

  1. NGC Neo Tie-Ins
  2. Apache Forties Flex Re-Route Bravo
  3. Maersk Olie Og COMB, Svend
  4. Perenco Welland & Inde Remedial Works
  5. Perenco NW Bell
  6. TOTAL Islay
  7. Apache Forties Charlie - ROV inspection
  8. Apache Forties PL PUP Piece Recovery
  9. Maerks Gryphon Repair
  10. Fairfield IRM Merlin / Dunlin


2010

  1. KNOC valve operations
  2. PTSC Pearl IRM operations
  3. PTSC Topaz IRM operations
  4. Maersk Oil UK Gryphon - phase 1
  5. ExxonMobil Beryl IRM and decommissioning
  6. Maersk Oil UK Gryphon - phase 2
  7. CNR Ninian south platform jacket repair (nepsus hyperbaric welding)
  8. Hudson Oil Field
    • United Kingdom
    • Acergy/Dana
    • Hudson well tie in and testing
  9. PetroCanada well W6 connection tie in and testing
  10. Fairfield P3 IRM works - phase 1
  11. Silverstone Tristan valve and decommissioning
  12. Maersk Oil UK Gryphon GP3 subsea IRM scope DC2 retagging and Lochranza change out
  13. Fairfield IRM - phase 2
  14. Don Area Oil Fields
    • United Kingdom
    • Enquest
    • Don tie ins - phase 1
    • 2010
  15. Fairfield Osprey P8 well remedial works
  16. Perenco Wellend/Granby/Tristan IRM
  17. Don Area Oil Fields
    • United Kingdom
    • Enquest
    • Don tie ins - phase 2 and 3
    • 2010


2009

  1. BP Immortelle construction works offshore Trinidad
  2. Nexen Ettrick well tie ins and FPSO installation prep (2 phases)
  3. Total Jura area tie ins
  4. Eon Rhurgas Rita well methanol flushing
  5. Helicopter recovery
  6. Apache NS Forties area flexible flowline installation and tie ins
  7. Maersk Denmark full Danish North Sea IRM campaign
  8. Centrica SNS IRM programme
  9. CNR Nepsys wet welding repairs to Ninian platform brace
  10. Fairfield Dunlin/Osprey area IRM
  11. BP Vietnam IRM programme
  12. ExxonMobil Beryl area and Linnie decommissioning work and seasonal IRM
  13. Saxon Oil Field
    • Petro-Canada
    • Saxon SA well tie ins
  14. Talisman – Full North Sea 365 day DSV support with Bibby Sapphire


2008

  1. Shell L9 construction project
  2. Savonette Gas Field
    • Trinidad
    • BP
    • Construction works offshore
  3. BP Noel calm buoy installation offshore Trinidad
  4. Saipem/Maersk Halfdan spool installation and testing
  5. Technip/Apache Forties tie ins
  6. Technip/Oilexco Brenda tie ins
  7. Fairfield Dunlin area IRM
  8. Talisman – wage caisson riser installation (PM and Engineering)
  9. Talisman – full North Sea 365 day DSV support with Bibby Sapphire works including:
  10. Buchan Oil Field
    • United Kingdom
    • Talisman
    • Buchan Umbilical replacement
  11. Tartan Oil Field
    • United Kingdom
    • Tartan/Highlander Spool installation & tie ins
  12. SCM/Choke and change out at Ross and Tweedsmuir
  13. Flexible change out & recovery
  14. Tartan Oil Field
    • United Kingdom
    • 13km Power cable installation at Tartan


2007

  1. Acergy – project support with Bibby Sapphire (120 days)
  2. Petro-Canada – Saxon project – EPIC subsea construction
  3. Shamrock and Caravel Offshore Gas Fields
    • United Kingdom
    • Shell
    • Caravel/L9 – subsea construction project
  4. Talisman – full North Sea DSV support with Bibby Sapphire including:
  5. Umbilical replacement & J tube pull ins
  6. Spool installation & tie Ins
  7. Pipeline dewatering
  8. Well testing, methanol flushing & diagnostics
  9. SCM/Choke & accumulator change out
  10. Flexible change out & recovery


2006

  1. Cannonball Gas Field
    • BP
    • OTSL/Caldive
    • Trinidad
    • Spool installation and tie-ins

OTSL/Caldive/Stolt – BG/NGC – pipeline repair ExxonMobil Arthur 3 flexible and UMB lay/trench and tie-ins Centrica SNS annual IRM Nexan – IRM Talisman – Claymore UMB replacement and hook-up. Flex. Jumper installation Maersk (Denmark) Bi-annual diving based IRM – up to 30 worksites ConocoPhillips – Tethys Field tie-in


2005

PetroCanada Guillemott/Clapham IRM

  1. Tiffany Oil Field
    • CNR
    • Toni, Thelma and Glamis subsea intervention works

Saipem Tullow Horne and Wren subsea tie-ins Total North Sea Asset IRM programme (Ph 1) ExxonMobil LP6 tie-ins ConocoPhillips SNS pipeline U/T Works Technip/Shell Corrib structure installation

  1. Tiffany Oil Field
    • CNR
    • Toni well conversation to gas lift

Total IRM (Ph 2)

  1. Kittiwake Oil Field
    • Subsea 7/Venture
    • Kittiwake SAL inspection

MOD Tornado jet wreckage recovery

  1. Johnston Gas Field
    • Technip – Caledonia
    • Johnston tie-ins


2004

  1. BP/Gupco, Egypt pipeline repair programme
  2. ENI/Kerr McGee/Talisman UWG wellhead decommissioning
  3. Forties Oil Field
    • Apache/Clough
    • Forties Echo riser/subsea construction
  4. Camelot Gas Fields
    • ExxonMobil
    • Camelot East riser prep works
  5. Piper Oil Field
    • Talisman
    • Piper/Saltire bundle repair & maintenance
  6. Balmoral Oil Field
    • Talisman
    • Beauly flexible flowline recovery
  7. Balmoral Oil Field
    • ENI
    • Stirling bypass works
  8. Ross and Blake Oil Fields
    • BG
    • Blake wellhead repairs
  9. Beryl Oil Field
    • ExxonMobil
    • Nevis Central Lewis tie-ins
  10. Beryl Oil Field
    • ExxonMobil
    • Buckland “C” Development
    • EPIC