Difference between revisions of "Berri Oil Field"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "=== Summary Information === * Operator: * Country: * Location: * Production start: * Partners: * Type: Oil / Gas * Estimated Reserves: * Production Volume: === Descrip...")
 
Line 11: Line 11:
 
=== Description ===
 
=== Description ===
 
*  
 
*  
 +
* Associated gas is processed at the [[Khursaniyah Gas Processing Plant]]
 +
==== Berri Increment Program ====
 +
* The expansion includes a new water injection facility, two drilling islands, 11 oil and water offshore platforms and 9 onshore oil production and water supply drill sites.
 +
* It also includes a new gas oil separation plant in Abu Ali Island to process 500,000 barrels of Arabian Light Crude Oil per day, and additional gas processing facilities at the Khursaniyah gas plant to process 40,000 barrels of associated hydrocarbon condensate.
  
 
=== Contractors ===
 
=== Contractors ===
Line 16: Line 20:
  
 
=== History ===
 
=== History ===
*  
+
* 2019 - Contracts awarded for increment program
  
 
=== Geology ===
 
=== Geology ===
Line 22: Line 26:
  
 
=== Links ===
 
=== Links ===
#
+
# [https://abarrelfull.blogspot.com/2023/01/saudi-aramco-awards-contracts-valued-at.html Saudi Aramco awards contracts valued at $18 billion to increase Marjan and Berri oilfields’ production capacity]
  
  

Revision as of 14:49, 17 January 2023

Summary Information

  • Operator:
  • Country:
  • Location:
  • Production start:
  • Partners:
  • Type: Oil / Gas
  • Estimated Reserves:
  • Production Volume:

Description

Berri Increment Program

  • The expansion includes a new water injection facility, two drilling islands, 11 oil and water offshore platforms and 9 onshore oil production and water supply drill sites.
  • It also includes a new gas oil separation plant in Abu Ali Island to process 500,000 barrels of Arabian Light Crude Oil per day, and additional gas processing facilities at the Khursaniyah gas plant to process 40,000 barrels of associated hydrocarbon condensate.

Contractors

  • -

History

  • 2019 - Contracts awarded for increment program

Geology

Links

  1. Saudi Aramco awards contracts valued at $18 billion to increase Marjan and Berri oilfields’ production capacity