Difference between revisions of "Berling Gas and Condensate Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
(3 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
* Country: Norway | * Country: Norway | ||
* Location: Haltenbanken in the Norwegian Sea | * Location: Haltenbanken in the Norwegian Sea | ||
− | * Production start: | + | * Production start: planned for 2028 |
* Partners: Equinor Energy AS (40%), DNO Norge AS (20%) and Sval Energi AS* (10%) | * Partners: Equinor Energy AS (40%), DNO Norge AS (20%) and Sval Energi AS* (10%) | ||
* Type: Gas and Condensate | * Type: Gas and Condensate | ||
Line 13: | Line 13: | ||
* The rich gas will be processed on Åsgard B and transported via the Åsgard Transport System for further processing at Kårstø gas processing plant. | * The rich gas will be processed on Åsgard B and transported via the Åsgard Transport System for further processing at Kårstø gas processing plant. | ||
* The condensate will be transferred to Åsgard and co-mingled with other Åsgard production for storage and export by shuttle tankers to the market | * The condensate will be transferred to Åsgard and co-mingled with other Åsgard production for storage and export by shuttle tankers to the market | ||
+ | * The field was previously known as Hades/Iris | ||
=== Contractors === | === Contractors === | ||
− | * | + | * '''Aker Solutions:''' |
+ | ** FEED | ||
+ | ** EPCIC: engineering, procurement, construction, installation and commissioning of subsea tie backs | ||
=== History === | === History === | ||
* 2018 - Iris and Hades were discovered | * 2018 - Iris and Hades were discovered | ||
* 2022 - PDO was submitted | * 2022 - PDO was submitted | ||
+ | * 2023 - Final Investment decision made | ||
=== Geology === | === Geology === | ||
− | * | + | * Hades a gas/condensate column totalling about 35 metres in the Lange formation. 15 metres of this constitutes the reservoir, which consists of sandstone with moderate to good reservoir properties. |
+ | * Iris - the well encountered a gas/condensate column totalling about 95 metres in the Garn formation. 85 metres of this constitutes the reservoir, which consists of sandstone with variable reservoir quality from moderate to very good. | ||
=== Links === | === Links === | ||
+ | # [https://abarrelfull.blogspot.com/2023/01/discovery-in-norwegian-north-sea.html Discovery In the Norwegian North Sea] | ||
# [https://abarrelfull.blogspot.com/2023/01/berling-pdo-submitted-to-authorities.html Berling PDO Submitted to the Authorities] | # [https://abarrelfull.blogspot.com/2023/01/berling-pdo-submitted-to-authorities.html Berling PDO Submitted to the Authorities] | ||
+ | # [https://abarrelfull.blogspot.com/2024/01/omvs-plan-for-berling-gas-and.html OMV’s plan for the Berling gas and condensate discovery approved by Norwegian authorities] | ||
+ | # [https://abarrelfull.blogspot.com/2024/01/aker-solutions-awarded-asgard-b-berling.html Aker Solutions awarded Åsgård B Berling tie-back] | ||
Latest revision as of 17:58, 4 January 2024
Summary Information
- Operator: OMV
- Country: Norway
- Location: Haltenbanken in the Norwegian Sea
- Production start: planned for 2028
- Partners: Equinor Energy AS (40%), DNO Norge AS (20%) and Sval Energi AS* (10%)
- Type: Gas and Condensate
- Estimated Reserves: The estimated recoverable resources are expected to be some 45 million barrels of oil equivalents
- Production Volume:
Description
- The development concept for the Berling field is a 4-slot subsea production template tied back via a 24-kilometer pipeline to the Equinor-operated Åsgard B platform
- The rich gas will be processed on Åsgard B and transported via the Åsgard Transport System for further processing at Kårstø gas processing plant.
- The condensate will be transferred to Åsgard and co-mingled with other Åsgard production for storage and export by shuttle tankers to the market
- The field was previously known as Hades/Iris
Contractors
- Aker Solutions:
- FEED
- EPCIC: engineering, procurement, construction, installation and commissioning of subsea tie backs
History
- 2018 - Iris and Hades were discovered
- 2022 - PDO was submitted
- 2023 - Final Investment decision made
Geology
- Hades a gas/condensate column totalling about 35 metres in the Lange formation. 15 metres of this constitutes the reservoir, which consists of sandstone with moderate to good reservoir properties.
- Iris - the well encountered a gas/condensate column totalling about 95 metres in the Garn formation. 85 metres of this constitutes the reservoir, which consists of sandstone with variable reservoir quality from moderate to very good.