Berantai Gas Field
Jump to navigation
Jump to search
Summary Information
- Operator: PETRONAS
- Country: Malaysia
- Location: PM 309, South China Sea, offshore Peninsular Malaysia
- Production start: 2012
- Partners:
- Type: Gas
- Estimated Reserves:
- Production Volume:
+++ Description
- The development comprises a wellhead platform connected to a floating production storage and off-loading (“FPSO”) vessel, the [[[Berantai FPSO]]].
- Gas is exported by a 30km subsea pipeline to the PETRONAS Carigali-operated [[[Angsi Oil And Gas Field]]] and onwards to the [[[Kertih Gas Processing Plants]]] and the Peninsular Malaysian gas grid.
+++ Contractors
- **MMCOG:** Detailed Design Engineering Work for Wellhead Platform Topside
- **TL Offshore:** ANDR-A to PLET Gas Export Pipeline
- **BC Petrochemical:** Chemical Injection Skid
+++ History
- 2011 - RSC agreement signed
- 2012 - First gas produced
+++ Geology
+++ Links
- [[[MMCOG Platform References]]]
- [[[BC Petrochemical Oil And Gas Processing References]]]
- [[[Exploration And Production In Malaysia]]]
- [[[Serimax Asia Pipeline References]]]
- Petrofac to Lead Development of Berantai Field For Petronas
- Sapurakencana Petroleum Berhad - Berantai Project Commence Gas Production
- Petronas Announces Successes From The Berantai And Balai Cluster Risk Service Contracts, And Discovery At Tembakau-1 Well
- Petrofac Brings Berantai On Stream Offshore Malaysia