Belbazem Offshore Oil and Gas Fields
Revision as of 13:44, 3 May 2024 by Abarrelfull (talk | contribs)
Summary Information
- Operator: ADNOC
- Country: UAE
- Location:
- Production start: 2024
- Partners: CNPC
- Type: Oil & Gas
- Estimated Reserves:
- Production Volume:
Description
- Located 120 kilometers northwest of Abu Dhabi city, the Belbazem Block consists of three offshore fields; Belbazem, Umm Al Salsal and Umm Al Dholou.
- The development includes three offshore Well Head Towers (WHTs), one in each of the Block’s three fields, interconnecting sub-sea pipelines, and cables to Zirku Island, located around 60 kilometers from Belbazem field
- The Belbazem block utilises the processing facilities of Satah Al-Razboot SARB Oil Field
- Production capacity at the Belbazem offshore block is set to progressively ramp up to 45,000 barrels per day (bpd) of light crude and 27 million standard cubic feet per day (mmscfd) of associated gas
Contractors
- National Petroleum Construction Company (NPCC): Engineering, procurement and construction (EPC) contract
History
- 2021 - EPC contract awarded
- 2024 - First oil produced