* Located 120 kilometers northwest of Abu Dhabi city, the Belbazem Block consists of three offshore fields; Belbazem, Umm Al Salsal and Umm Al Dholou.
 
* Located 120 kilometers northwest of Abu Dhabi city, the Belbazem Block consists of three offshore fields; Belbazem, Umm Al Salsal and Umm Al Dholou.
* The Belbazem block is tied back to the facilities of [[Satah Al-Razboot SARB Oil Field]]
+
* The development includes three offshore Well Head Towers (WHTs), one in each of the Block’s three fields, interconnecting sub-sea pipelines, and cables to Zirku Island, located around 60 kilometers from Belbazem field
 +
* The Belbazem block utilises the processing facilities of [[Satah Al-Razboot SARB Oil Field]]
 +
* Production capacity at the Belbazem offshore block is set to progressively ramp up to 45,000 barrels per day (bpd) of light crude and 27 million standard cubic feet per day (mmscfd) of associated gas
  
 
=== Contractors ===
 
=== Contractors ===
* -
+
* '''NPCC and Petrofac JV:''' Front End Engineering Design (FEED) services
 +
* '''National Petroleum Construction Company (NPCC):''' Engineering, procurement and construction (EPC) contract
  
 
=== History ===
 
=== History ===
*  
+
* 2019 - FEED awarded
 +
* 2021 - EPC contract awarded
 +
* 2024 - First oil produced
  
 
=== Geology ===
 
=== Geology ===
Line 23: Line 28:
  
 
=== Links ===
 
=== Links ===
#
+
# [https://abarrelfull.blogspot.com/2024/05/npcc-and-petrofac-jv-awarded-offshore.html NPCC and Petrofac JV Awarded Offshore Contract by Al Yasat Petroleum, an ADNOC Group Company]
 +
# [https://abarrelfull.blogspot.com/2024/05/adnoc-awards-744-million-contract-for.html ADNOC Awards $744 Million Contract for Full Field Development of the Belbazem Offshore Block]
 +
# [https://a-barrel-full.blogspot.com/2024/05/adnoc-announces-first-production-from.html ADNOC Announces First Production from Belbazem Offshore Block]
  
  

Latest revision as of 13:48, 3 May 2024

Summary Information

  • Operator: ADNOC
  • Country: UAE
  • Location:
  • Production start: 2024
  • Partners: CNPC
  • Type: Oil & Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • Located 120 kilometers northwest of Abu Dhabi city, the Belbazem Block consists of three offshore fields; Belbazem, Umm Al Salsal and Umm Al Dholou.
  • The development includes three offshore Well Head Towers (WHTs), one in each of the Block’s three fields, interconnecting sub-sea pipelines, and cables to Zirku Island, located around 60 kilometers from Belbazem field
  • The Belbazem block utilises the processing facilities of Satah Al-Razboot SARB Oil Field
  • Production capacity at the Belbazem offshore block is set to progressively ramp up to 45,000 barrels per day (bpd) of light crude and 27 million standard cubic feet per day (mmscfd) of associated gas

Contractors

  • NPCC and Petrofac JV: Front End Engineering Design (FEED) services
  • National Petroleum Construction Company (NPCC): Engineering, procurement and construction (EPC) contract

History

  • 2019 - FEED awarded
  • 2021 - EPC contract awarded
  • 2024 - First oil produced

Geology

Links

  1. NPCC and Petrofac JV Awarded Offshore Contract by Al Yasat Petroleum, an ADNOC Group Company
  2. ADNOC Awards $744 Million Contract for Full Field Development of the Belbazem Offshore Block
  3. ADNOC Announces First Production from Belbazem Offshore Block