Belanak FPSO

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Name: Belanak FPSO
  • Field: Belanak Oil and Gas Field
  • Country: Indonesia
  • Ownership:
  • Website:
  • Field Operated By: ConocoPhillips
  • Capacity: 100,000 bpd
  • Year of Completion:

+++ Brief Description

  • The topsides facilities of the new build spread-moored FPSO, weighing over 15,000 tonnes, can process approximately 100,000 barrels per day of total hydrocarbon liquids, including cryogenic processing for the production and export of the LPG products, and up to 350 million standard cubic feet of gas per day.
  • The hull has a storage capacity of one million barrels of oil.
  • It was the first offshore liquefied petroleum gas (LPG) facility on a floating vessel in the Asia Pacific region

+++ Contractors

  • KBR: Project management, engineering, procurement, construction and installation (EPCI) services
  • **JGC:** Design, procurement, construction, and start-up assistance services for Floating Production Storage and Offloading (FPSO) facilities, flexible risers, and subsea cables
  • **DNS:** Vessel Construction
  • **McDermott:** Engineering, procurement, construction, installation, precommissioning and onshore commissioning assistance for FPSO topsides

+++ Status

  • In operation

+++ History

+++ Other Information

  • The vessel includes the world’s first FPSO-based LPG plant

+++ Links

  1. McDermott Platform References
  2. International Protective Coatings FPSO References
  3. Halliburton's Kellogg Brown & Root Awarded $600 Million EPCI Contract For Conoco Belanak FPSO in Indonesia
  4. Contract Awarded for Offshore Gas Processing Facilities in Indonesia
  5. Start of crude oil and condensate production from Belanak oil and gas field in the South Natuna Sea Block B Production Sharing Contract, Indonesia
  6. Belanak Natuna FPSO topsides