Bassein Oil and Gas Field

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Operator: ONGC
  • Country: India
  • Location:
  • Production start:
  • Partners:
  • Type: Oil & Gas
  • Estimated Reserves:
  • Production Volume:

+++ Description

  • The BCP-B platform and BCP-B2 Booster Compressor Platform are bridge linked
  • The gas produced is very sour and corrosive
  • Oil and Gas are transported by pipeline to the Uran Oil And Gas Processing Plant
  • **Vasai East Development Project:**
    • The Vasai East Development Project included new booster compressors and a process facilities platform at BCPA-2.
    • The project has oil handling capacity of 4200 barrels per day, gas processing facility of 12 cubic metres per day and water injection of 47000 barrels per day

+++ Contractors

  • **Hyundai Heavy Industries:**
    • Construction of South Bassein Platform Complex
    • Construction of South Bassein Hazira Trunkline
  • **Saipem:** South Bassein BPB Complex Project Phase 2 - gas platforms and gathering sealines - EPIC
  • **Seaway Heavy Lifting:** Installation of BCP-B2 Booster Compression Platform

++++ Vasai East Development Project:

  • **L&T-Samsung:** Engineering, procurement, onshore fabrication and transportation of the critical booster and high pressure compression modules
  • McDermott: Installation of the platform


+++ History

  • 2004 - Kvaerner E&C wins contract for detailed engineering of the submarine pipelines and ancillary systems for the Mumbai-Uran Trunk project
  • 2005 - Booster Compression Platform contract awarded
  • 2006 - Contracts awarded for Vasai East

+++ Geology

+++ Links

  1. World Bank, South Bassein Offshore Gas Development Project
  2. FoundOcean Asia Subsea References
  3. Hyundai Heavy Industries Platform References
  4. Seaway Heavy Lifting Oil And Gas References
  5. Saipem Fixed Offshore Production Facilities Project References
  6. Mumbai - Uran Terminal Pipeline Project
  7. L&T Bags Rs. 1000 Crore ONGC Order
  8. L&T Wins Additional ONGC Order For Rs. 1300 Crores
  9. L&T-Samsung Consortium Wins Rs. 2117 Crore ONGC Order
  10. J. Ray McDermott Awarded Installation Projects in India