Barracuda Oil Field

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Operator: Petrobras
  • Country: Brazil
  • Location: 100 km from the coast of Rio de Janeiro in the Campos Basin
  • Production start: 2005
  • Partners:
  • Type: Oil / Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • The field utilises the Barracuda P 43 FPSO, which has capacity to produce 150,000 barrels per day of oil plus gas compression capacity of 6 million m3/d

Contractors

  • **KBR:** Lump Sum EPC contract
  • **Jurong Shipyard:**
    • FPSO conversion
    • Fabrication of topside production modules
    • Integration of the Barracuda topside production modules with its newly-converted hull

History

  • 1989 - Barracuda Oil Field discovered
  • 2005 - Production commences on the Barracuda Oil Field
  • 2012 - A flaw in a pipe caused the leak 5m ³ of oil into the sea

Geology

Links

  1. Jurong Shipyard FPSO References
  2. Jurong Shipyard secured a US$80 million FPSO conversion project
  3. Jurong Shipyard's Brazillian Joint Venture Secures First Contract Of S$270 Million
  4. Halliburton Announces Significant Achievement in Barracuda-Caratinga Project
  5. Leak in Barracuda Field