Difference between revisions of "Barossa Area Oil and Gas Field Development"

From A Barrel Full
Jump to navigation Jump to search
Line 32: Line 32:
 
# [http://killajoules.wikidot.com/blog:2637 SK E&S to fund up to US$520 million in carry obligations and contingent milestone payments]
 
# [http://killajoules.wikidot.com/blog:2637 SK E&S to fund up to US$520 million in carry obligations and contingent milestone payments]
 
# [https://abarrelfull.blogspot.com/2021/12/barossa-project-awards-feed-contracts.html Barossa project awards FEED contracts]
 
# [https://abarrelfull.blogspot.com/2021/12/barossa-project-awards-feed-contracts.html Barossa project awards FEED contracts]
 +
# [ MODEC Awarded Contract to Supply FPSO for Barossa Field offshore Australia by ConocoPhillips]
 
# [https://abarrelfull.blogspot.com/2021/12/santos-announces-fid-on-barossa-gas.html Santos announces FID on the Barossa gas project for Darwin LNG]
 
# [https://abarrelfull.blogspot.com/2021/12/santos-announces-fid-on-barossa-gas.html Santos announces FID on the Barossa gas project for Darwin LNG]
 
# [https://a-barrel-full.blogspot.com/2021/12/jera-to-invest-in-barossa-gas-field-in.html JERA to Invest in the Barossa Gas Field in Australia to Secure a Stable LNG Supply]
 
# [https://a-barrel-full.blogspot.com/2021/12/jera-to-invest-in-barossa-gas-field-in.html JERA to Invest in the Barossa Gas Field in Australia to Secure a Stable LNG Supply]

Revision as of 14:32, 8 December 2021

Summary Information

  • Operator: Santos
  • Country: Australia
  • Location: 300 kilometres north of Darwin
  • Production start: 2025 expected
  • Partners:
  • Type: Gas & Condensate
  • Estimated Reserves:
  • Production Volume:

Description

  • The Barossa gas field is located in Australian waters off the Northern Territory of Australia. The Project will develop the Barossa gas field and link it by pipeline to the Darwin LNG Terminal for LNG production, which is expected to start around 2025.
  • It will comprise a Floating Production, Storage and Offloading (FPSO) vessel, subsea production wells, supporting subsea infrastructure and a gas export pipeline tied into the existing Bayu-Undan to Darwin LNG pipeline.

Contractors

  • MODEC:
    • Front End Engineering Design (FEED) contract for the Barossa FPSO
    • Engineering, Procurement, Construction and Installation (EPCI) of the Barossa FPSO, including topsides processing equipment as well as hull and marine systems.

History

  • 2005 - Caldita field discovered
  • 2012 - SK Group takes a stake in the project
  • 2018 - FEED contracts awarded
  • 2021 - FID announced for the project
  • 2021 - Jera bought a 12.5% stake in the gas field

Geology

Links

  1. New gas field discovered offshore Northern Territory
  2. SK E&S to fund up to US$520 million in carry obligations and contingent milestone payments
  3. Barossa project awards FEED contracts
  4. [ MODEC Awarded Contract to Supply FPSO for Barossa Field offshore Australia by ConocoPhillips]
  5. Santos announces FID on the Barossa gas project for Darwin LNG
  6. JERA to Invest in the Barossa Gas Field in Australia to Secure a Stable LNG Supply