Difference between revisions of "Barossa Area Oil and Gas Field Development"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 11: | Line 11: | ||
=== Description === | === Description === | ||
* The Barossa gas field is located in Australian waters off the Northern Territory of Australia. The Project will develop the Barossa gas field and link it by pipeline to the [[Darwin LNG Terminal]] for LNG production, which is expected to start around 2025. | * The Barossa gas field is located in Australian waters off the Northern Territory of Australia. The Project will develop the Barossa gas field and link it by pipeline to the [[Darwin LNG Terminal]] for LNG production, which is expected to start around 2025. | ||
+ | * It will comprise a Floating Production, Storage and Offloading (FPSO) vessel, subsea production wells, supporting subsea infrastructure and a gas export pipeline tied into the existing Bayu-Undan to Darwin LNG pipeline. | ||
=== Contractors === | === Contractors === |
Revision as of 14:11, 8 December 2021
Summary Information
- Operator: Santos
- Country: Australia
- Location: 300 kilometres north of Darwin
- Production start: 2025 expected
- Partners:
- Type: Gas & Condensate
- Estimated Reserves:
- Production Volume:
Description
- The Barossa gas field is located in Australian waters off the Northern Territory of Australia. The Project will develop the Barossa gas field and link it by pipeline to the Darwin LNG Terminal for LNG production, which is expected to start around 2025.
- It will comprise a Floating Production, Storage and Offloading (FPSO) vessel, subsea production wells, supporting subsea infrastructure and a gas export pipeline tied into the existing Bayu-Undan to Darwin LNG pipeline.
Contractors
- -
History
- 2005 - Caldita field discovered
- 2012 - SK Group takes a stake in the project
- 2021 - Jera bought a 12.5% stake in the gas field