Barcarena LNG Terminal

From A Barrel Full
Revision as of 14:21, 29 February 2024 by Abarrelfull (talk | contribs)
Jump to navigation Jump to search

Summary Information

Brief Description

  • A floating gasification terminal based on the Energos Celsius Floating Storage Regasification Unit (FSRU)

Technical Details

  • Storage capacity:
  • Unloading capacity:
  • Send out capacity:
  • Constructor:

Ongoing Projects/Project Status

  • The terminal began operations in 2024

Suppliers / Customers

  • Suppliers:
  • Customers:
    • Alunorte Alumina Refinery
    • The Barcarena terminal will also supply natural gas to NFE’s 630 MW power plant from 2025.

History

  • 2021 - Gas sales agreement signed with Alunorte Alumina Refinery
  • 2024 - The terminal entered operation

Other Information

-

Links

  1. NFE and Hydro Finalize Definitive Commercial Terms for Natural Gas Supply to the Alunorte Alumina Refinery in the State of Pará, Brazil
  2. New Fortress Energy Places Barcarena LNG Terminal in Pará, Brazil into Operation