* Location:Para, Brazil
 
* Location:Para, Brazil
* Capacity: million tons/annum
+
* Capacity: 6.0 million tons/annum
* Status: Under construction
+
* Status: In operation
  
 
=== Brief Description ===
 
=== Brief Description ===
 
+
* A floating gasification terminal based on the Energos Celsius Floating Storage Regasification Unit (FSRU)
  
 
=== Technical Details ===
 
=== Technical Details ===
Line 18: Line 18:
  
 
=== Ongoing Projects/Project Status ===
 
=== Ongoing Projects/Project Status ===
* Under construction, completion expected in [[LNG Terminal Projects to be Completed in 2022 | 2022]]
+
* The terminal began operations in [[LNG Terminal Projects to be Completed in 2024 | 2024]]
  
 
=== Suppliers / Customers ===
 
=== Suppliers / Customers ===
  
* Suppliers:
+
* Suppliers:  
* Customers: Alunorte Alumina Refinery
+
* Customers:  
 +
** Alunorte Alumina Refinery
 +
** The Barcarena terminal will also supply natural gas to NFE’s 630 MW power plant from 2025.
  
 
=== History ===
 
=== History ===
  
 
* 2021 - Gas sales agreement signed with Alunorte Alumina Refinery
 
* 2021 - Gas sales agreement signed with Alunorte Alumina Refinery
 +
* 2024 - The terminal entered operation
  
 
=== Other Information ===
 
=== Other Information ===
Line 34: Line 37:
 
=== Links ===
 
=== Links ===
 
# [https://abarrelfull.blogspot.com/2022/01/nfe-and-hydro-finalize-definitive.html NFE and Hydro Finalize Definitive Commercial Terms for Natural Gas Supply to the Alunorte Alumina Refinery in the State of Pará, Brazil]
 
# [https://abarrelfull.blogspot.com/2022/01/nfe-and-hydro-finalize-definitive.html NFE and Hydro Finalize Definitive Commercial Terms for Natural Gas Supply to the Alunorte Alumina Refinery in the State of Pará, Brazil]
 +
# [https://lng-news.blogspot.com/2024/02/new-fortress-energy-places-barcarena.html New Fortress Energy Places Barcarena LNG Terminal in Pará, Brazil into Operation]
  
 
[[category:LNG]]
 
[[category:LNG]]
 
[[category:Brazil]]
 
[[category:Brazil]]
 
[[category:New Fortress Energy]]
 
[[category:New Fortress Energy]]

Revision as of 14:21, 29 February 2024

Summary Information

Brief Description

  • A floating gasification terminal based on the Energos Celsius Floating Storage Regasification Unit (FSRU)

Technical Details

  • Storage capacity:
  • Unloading capacity:
  • Send out capacity:
  • Constructor:

Ongoing Projects/Project Status

  • The terminal began operations in 2024

Suppliers / Customers

  • Suppliers:
  • Customers:
    • Alunorte Alumina Refinery
    • The Barcarena terminal will also supply natural gas to NFE’s 630 MW power plant from 2025.

History

  • 2021 - Gas sales agreement signed with Alunorte Alumina Refinery
  • 2024 - The terminal entered operation