Difference between revisions of "Barcarena LNG Terminal"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 4: | Line 4: | ||
* Website: https://www.newfortressenergy.com/ | * Website: https://www.newfortressenergy.com/ | ||
* Location:Para, Brazil | * Location:Para, Brazil | ||
− | * Capacity: million tons/annum | + | * Capacity: 6.0 million tons/annum |
− | * Status: | + | * Status: In operation |
=== Brief Description === | === Brief Description === | ||
− | + | * A floating gasification terminal based on the Energos Celsius Floating Storage Regasification Unit (FSRU) which has a nominal regasification capacity of 750 million standard cubic feet per day (mmscfd) | |
=== Technical Details === | === Technical Details === | ||
Line 14: | Line 14: | ||
* Storage capacity: | * Storage capacity: | ||
* Unloading capacity: | * Unloading capacity: | ||
− | * Send out capacity: | + | * Send out capacity: 750 million standard cubic feet per day (mmscfd) |
− | * Constructor: | + | * Constructor: Seatrium |
=== Ongoing Projects/Project Status === | === Ongoing Projects/Project Status === | ||
− | * | + | * The terminal began operations in [[LNG Terminal Projects to be Completed in 2024 | 2024]] |
=== Suppliers / Customers === | === Suppliers / Customers === | ||
− | * Suppliers: | + | * Suppliers: |
− | * Customers: Alunorte Alumina Refinery | + | * Customers: |
+ | ** Alunorte Alumina Refinery | ||
+ | ** The Barcarena terminal will also supply natural gas to NFE’s 630 MW power plant from 2025. | ||
=== History === | === History === | ||
* 2021 - Gas sales agreement signed with Alunorte Alumina Refinery | * 2021 - Gas sales agreement signed with Alunorte Alumina Refinery | ||
+ | * 2023 - The FRSU was completed | ||
+ | * 2024 - The terminal entered operation | ||
=== Other Information === | === Other Information === | ||
Line 34: | Line 38: | ||
=== Links === | === Links === | ||
# [https://abarrelfull.blogspot.com/2022/01/nfe-and-hydro-finalize-definitive.html NFE and Hydro Finalize Definitive Commercial Terms for Natural Gas Supply to the Alunorte Alumina Refinery in the State of Pará, Brazil] | # [https://abarrelfull.blogspot.com/2022/01/nfe-and-hydro-finalize-definitive.html NFE and Hydro Finalize Definitive Commercial Terms for Natural Gas Supply to the Alunorte Alumina Refinery in the State of Pará, Brazil] | ||
+ | # [https://abarrelfull.blogspot.com/2024/02/seatrium-delivers-its-first-fsru.html Seatrium Delivers its First FSRU Project to New Fortress Energy] | ||
+ | # [https://lng-news.blogspot.com/2024/02/new-fortress-energy-places-barcarena.html New Fortress Energy Places Barcarena LNG Terminal in Pará, Brazil into Operation] | ||
[[category:LNG]] | [[category:LNG]] | ||
[[category:Brazil]] | [[category:Brazil]] | ||
[[category:New Fortress Energy]] | [[category:New Fortress Energy]] |
Latest revision as of 14:26, 29 February 2024
Contents
Summary Information
- Ownership: New Fortress Energy
- Website: https://www.newfortressenergy.com/
- Location:Para, Brazil
- Capacity: 6.0 million tons/annum
- Status: In operation
Brief Description
- A floating gasification terminal based on the Energos Celsius Floating Storage Regasification Unit (FSRU) which has a nominal regasification capacity of 750 million standard cubic feet per day (mmscfd)
Technical Details
- Storage capacity:
- Unloading capacity:
- Send out capacity: 750 million standard cubic feet per day (mmscfd)
- Constructor: Seatrium
Ongoing Projects/Project Status
- The terminal began operations in 2024
Suppliers / Customers
- Suppliers:
- Customers:
- Alunorte Alumina Refinery
- The Barcarena terminal will also supply natural gas to NFE’s 630 MW power plant from 2025.
History
- 2021 - Gas sales agreement signed with Alunorte Alumina Refinery
- 2023 - The FRSU was completed
- 2024 - The terminal entered operation
Other Information
-