Difference between revisions of "Barboni Gas Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: ENI * Country: Egypt * Location: North Port Said * Production start: * Partners: * Type: Oil / Gas * Estimated Reserves: * Production Volum...") |
Abarrelfull (talk | contribs) |
||
Line 13: | Line 13: | ||
+++ Contractors | +++ Contractors | ||
+ | * ENPPI: Platform installation | ||
* **Micoperi:** Hook up activities, PLEM and spools installation on Akhen, Temsah 4 and Barboni Platforms | * **Micoperi:** Hook up activities, PLEM and spools installation on Akhen, Temsah 4 and Barboni Platforms | ||
Line 22: | Line 23: | ||
+++ Links | +++ Links | ||
+ | # [[ENPPI Gas Processing References]] | ||
# [[Micoperi Offshore And Platform References]] | # [[Micoperi Offshore And Platform References]] |
Latest revision as of 17:10, 14 March 2024
Summary Information
- Operator: ENI
- Country: Egypt
- Location: North Port Said
- Production start:
- Partners:
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
+++ Description
+++ Contractors
- ENPPI: Platform installation
- **Micoperi:** Hook up activities, PLEM and spools installation on Akhen, Temsah 4 and Barboni Platforms
+++ History
+++ Geology
+++ Links