Difference between revisions of "Barbara Gas Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: ENI * Country: Italy * Location: Adriatic * Production start: * Partners: * Type: Oil / Gas * Estimated Reserves: * Production Volume: ++...") |
Abarrelfull (talk | contribs) |
||
Line 15: | Line 15: | ||
+++ Contractors | +++ Contractors | ||
* **Saipem:** | * **Saipem:** | ||
− | + | ** Barbara D Topsides fabrication and installation | |
− | + | ** Engineering Services for Barbara F - eight legged jacket - unmanned DP platform | |
* **Tecon:** Barbara NW - Basic and detail structural design of jacket and deck | * **Tecon:** Barbara NW - Basic and detail structural design of jacket and deck | ||
Latest revision as of 07:27, 4 January 2023
Summary Information
- Operator: ENI
- Country: Italy
- Location: Adriatic
- Production start:
- Partners:
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
+++ Description
- There are 9 production platforms, A, B, C, D, E, F, G, H & NW
- A total of 69 wells are in production
+++ Contractors
- **Saipem:**
- Barbara D Topsides fabrication and installation
- Engineering Services for Barbara F - eight legged jacket - unmanned DP platform
- **Tecon:** Barbara NW - Basic and detail structural design of jacket and deck
+++ History
- 1987 - Barbara D platform installed
- 2997 - Barbara NW project started
+++ Geology
+++ Links