Barbara Gas Field

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Operator: ENI
  • Country: Italy
  • Location: Adriatic
  • Production start:
  • Partners:
  • Type: Oil / Gas
  • Estimated Reserves:
  • Production Volume:

+++ Description

  • There are 9 production platforms, A, B, C, D, E, F, G, H & NW
  • A total of 69 wells are in production

+++ Contractors

  • **Saipem:**
    • Barbara D Topsides fabrication and installation
    • Engineering Services for Barbara F - eight legged jacket - unmanned DP platform
  • **Tecon:** Barbara NW - Basic and detail structural design of jacket and deck

+++ History

  • 1987 - Barbara D platform installed
  • 2997 - Barbara NW project started

+++ Geology

+++ Links

  1. Fact Book 2005
  2. Offshore Platforms in Italy
  3. Saipem Europe Fixed Offshore Production Facilities Project R
  4. Saipem Fixed Offshore Production Facilities Engineering Refe
  5. Tecon Platform References