Banyu Urip Oil Field

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Operator: Exxon
  • Country: Indonesia
  • Location: Cepu block in East Java
  • Production start: 2009
  • Partners: Exxon - 45%, Pertamina - 45%, Local Government Co.s -10%
  • Type: Oil
  • Estimated Reserves: 450 million barrels
  • Production Volume: 130,000 barrels of oil per day

+++ Description

  • Full field development is planned to produce 165,000 barrels of oil per day from facilities that include 49 wells on three well pads, a central processing facility, and a 60 mile (95 kilometer) pipeline to transfer the processed oil to a 1.7 million barrel floating storage and offloading (FSO) unit in the Java Sea. Tankers will load crude oil from the FSO for transport to domestic and world markets.
  • The Banyu Urip FSO is a conversion of the double Hull VLCC (Very Large Crude Carrier) made in 1993 was previously a Greek flag trade ship under the name of MT Chios. The vessel is classified as a very large vessel. The length is 327 meters and has dead-weight of 320,000 tons with storage capacity of 1.7 million barrels

+++ Contractors

  • This work is divided into five contracts of EPC with total value of approximately US$1.3 billion.
  • Those five contracts are projects for production process facility (EPC1), 20” onshore pipeline of 72 kilometer (EPC2), offshore pipeline and mooring tower (EPC3), floating storage and offloading facility (EPC4), and infrastructure facility and injected water storage dam (EPC5)
  • **Tripatra/Samsung** - Production Processing Facilities - (EPC1)
  • **PT. Inti Karya Persada Tehnik (IKPT) and PT. Kelsri:** Design and installation of insulated onshore pipeline - (EPC2)
  • **PT. Rekayasa Industri and Likpin LLC:** Engineering, procurement and construction contract for the project’s offshore pipeline and mooring facilities - (EPC 3)
  • **Sembcorp** - FSO Tanker Conversion Contract -(EPC4)
  • **PT. Rekayasa Industri (Rekind) and PT. Hutama Karya:** Engineering, procurement and construction contract for the design and building of Infrastructure Facilities (IF) - (EPC 5)
  • **Process Group:** 2 x 814 m3/h Deoiler Hydrocyclone Packages

+++ History

  • 2007 - Appraisal wells drilled
  • 2009 - Banyu Urip Project started operating its initial production facility
  • 2011 - Decision taken for full field development
  • 2011 - Award of the first of five engineering, procurement and construction contracts
  • 2012 - The Regional Government of Bojonegoro Regency issued all principle permits
  • 2015 - Central Processing Facility starts operations, boosting production

+++ Geology

+++ Links

  1. Process Group Oil And Gas Processing References
  2. MCL Starts Drilling Appraisal Well
  3. ExxonMobil, Pertamina Move Forward with Banyu Urip Full Field Development
  4. Mobil Cepu Ltd. Awards Contract for Banyu Urip Insulated Onshore Pipeline Facilities
  5. Mobil Cepu Ltd. Awards Contract for Banyu Urip Offshore Pipeline and Mooring Facilities
  6. Samsung Engineering And Tripatra Engineers & Constructors Consortium Awarded Contract From Mobil Cepu Ltd
  7. Sembcorp Marine's Subsidiary, Sembawang Shipyard Awarded Fso Tanker Conversion Contract From Mobil Cepu Ltd
  8. Mobil Cepu Ltd. awards contract for Banyu Urip Infrastructure Facilities
  9. FSO Vessel Of Cepu Block To Complete In January 2014
  10. All Principle Permits For Banyu Urip Production Facility To Immediately Issue
  11. ExxonMobil Starts Banyu Urip Central Processing Facility in Indonesia