Difference between revisions of "Balticconnector"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "=== Summary Information === * Source: * Destination: * Ownership: * Website: * Length: kilometres ( miles) * Capacity: per day * Status: (Operating/Planned/Under Cons...")
 
 
(6 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
=== Summary Information ===
 
=== Summary Information ===
  
* Source:  
+
* Source: Inkoo, Finland
* Destination:  
+
* Destination: Paldiski, Estonia
* Ownership:  
+
* Ownership: Gasgrid Finland & Elering
 
* Website:   
 
* Website:   
* Length: kilometres ( miles)  
+
** https://gasgrid.fi/
* Capacity: per day  
+
** https://elering.ee/
* Status: (Operating/Planned/Under Construction)
+
* Length: 153 kilometres ( miles)  
 +
* Capacity: The total transmission capacity of Balticconnector is 7.2 million cubic meters per day
 +
* Status: Operating
  
 
=== Details ===
 
=== Details ===
* -
+
* Balticconnector sea section from Paldiskist to Inkoon in Finland is 77 km. Mainland part in Estonia is 55 and in Finland 21 km.
  
 
=== History ===
 
=== History ===
* -  
+
* 2019 - The pipeline was commissioned
  
 
=== Other Information ===
 
=== Other Information ===
* -
+
* 75% of the EUR 250 million project was funded from the EU’s Connecting Europe Facility (CEF)
  
 
=== Links ===
 
=== Links ===
# []
+
# [https://abarrelfull.blogspot.com/2022/06/finnish-estonian-cooperation-secured.html Finnish-Estonian Cooperation Secured Successful Commissioning of Balticconnector]

Latest revision as of 16:41, 20 June 2022

Summary Information

  • Source: Inkoo, Finland
  • Destination: Paldiski, Estonia
  • Ownership: Gasgrid Finland & Elering
  • Website:
  • Length: 153 kilometres ( miles)
  • Capacity: The total transmission capacity of Balticconnector is 7.2 million cubic meters per day
  • Status: Operating

Details

  • Balticconnector sea section from Paldiskist to Inkoon in Finland is 77 km. Mainland part in Estonia is 55 and in Finland 21 km.

History

  • 2019 - The pipeline was commissioned

Other Information

  • 75% of the EUR 250 million project was funded from the EU’s Connecting Europe Facility (CEF)

Links

  1. Finnish-Estonian Cooperation Secured Successful Commissioning of Balticconnector